Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />was considered for this Planning Document. <br /> <br />Alternate G: Storage at lake Estes and Transmission to an Upgraded Water Treatment Plant <br />This altemate would involve a 50 gpm pumping facility to convey water stored in Lake Estes on the <br />east side of the City of Estes Park to an expanded water treatment plant, as described in A1temate <br />A. The transmission pipeline would parallel Colorado Highway 36 for much of its length. A possible <br />altemative (which would eliminate some of the transmission pipeline costs) would be to pipe water <br />from Lake Estes into the Little Thompson drainage, provided that resulting water losses from the <br />streambed and evaporation would be acceptable. <br /> <br />Alternate H: Storage at Pinewood lake and Transmission to an Upgraded Water Treatment <br />Plant <br />This altemate would involve a 50 gpm pumping facility to convey water stored in Pinewood Lake <br />located in Section 31 of Township 5N, Range 70W to the expanded water treatment plant, as <br />described in Altemate A. <br /> <br />Alternate I: Hauling Treated Water from Off-5ite Sources for Introduction Into the Pinewood <br />Springs Distribution System <br />This altemate is essentially the status quo altemate which must be considered. Pinewood Springs <br />will need to continue hauling water in from off-site during dry years if no other action is taken. <br />Despite significant conservation efforts and low per-capita water usage, it will not be possible for the <br />District to avoid water hauling without additional storage. <br /> <br />Power and Standby Power <br />Alternatives for standby power were considered in preparing this Planning Document. There is no <br />3-phase power supply loop to the project area available from Poudre Valley REA at present. <br />Therefore, standby power to increase reliability for the altemates evaluated will have to be provided <br />by either an on-site generator, rented mobile generators, or by extending an altemate power supply <br />loop to the area. <br /> <br />5 <br /> <br />