Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />IMPLEMENTATION SCHEDULE <br /> <br />The planned project implementation schedule breakdown follows. <br /> <br />Project Bidding <br /> <br />Project Standby Time <br /> <br />Project Construction <br /> <br />Construction <br />Engineering <br /> <br />Professional Engineer <br />Final Project Inspection, <br />Preparation of As..,built <br />Engineer Certification <br />Report, and Final <br />Project Closeout <br />Activities <br /> <br />6 to 7 weeks duration (includes bid advertisement, <br />bid letting, Pre-bid Conference, and contractor <br />selection <br /> <br />3 weeks (see Note in Table 1 for RCP manufacture <br />and delivery time to Pueblo, Colorado) <br /> <br />6 to 7 weeks duration (includes contractor <br />mobilization, pipeline demolition/removal of <br />existing concrete-encased wood stave pipeline <br />and appurtenances, installation/construction of <br />new reinforced concrete pipeline and <br />appurtenances, FPI Traveling Water Screen <br />installation, site cleanup and demobilization) <br /> <br />6 weeks <br /> <br />2 weeks <br /> <br />FUND REQUIREMENT SCHEDULE <br /> <br />The expected fund requirement for the Smith Arroyo Siphon Pipeline Project, for an <br />estimated total project cost of $505,000, is indicated below. <br /> <br />YEAR <br /> <br />2005 <br /> <br />FUND REQUIREMENT SCHEDULE <br />IDGH LINE CANAL COMPANY <br /> <br />CWCB <br /> <br />$50,500 <br /> <br />$454,500 <br /> <br />This schedule does not reflect the 1 % loan origination fee to be paid to the CWCB or <br />any payments on the project. <br />