Laserfiche WebLink
<br />FPI TRAVELING WATER SCREEN, CONVEYOR AND BAR TRASH RACKS <br /> <br />I. FPI Traveling Water Screen with <br />Conveyor and Appurtenances <br />(I assembly, delivered) <br /> <br />$76,900 $76,900 <br /> <br />EA <br /> <br />Screen (Cost $ 55,975.(0) <br /> <br />1- 7'-10" Wide x 20'-1" Long Mild Steel FPl Water Screen <br />1- Devoe Epoxy coating on frame of screen <br />1- IHp 480V 3 phase Baldor Drive Motor <br />1- I Hp Baldor Gear Reducer <br />1- 1.5 Hp 480V 3 phase Submersible Pump Motor <br />1- Grundfos 40815-5 Stainless Steel Submersible Pump <br />1- Yardney SF6-40 Epoxy coated Filter <br />1- Spray Wash Bar with High Pressure Brass Nozzles <br />1- Set of Stellite Water Lubricated bearings <br />Stainless Steel 304 wire weave belting 6 x 8 x 12 <br />Stainless Steel 304 Drive chain, supporting rods. <br />1- Shock Relay for overload protection (mounted in controller) <br />1- FPI Standard Control Panel <br />* NEMA 4 Weather Resistant Enclosure to be mounted on panel rack and anchored <br />into the ground or concrete pad. The control of the panel will be perfonned by an <br />H.OA (Hand, Off, Auto) Switch. In Hand mode the screen, wash pump and <br />conveyor will operate until the switch is turned off or to Automatic mode. In <br />automatic mode the machinery will operate with time delay relays, which can be <br />adjusted by the customer. <br /> <br />1~ Year limited warranty <br />1- Delivery to jobsite <br />6- Operations and Maintenance Manuals <br />2- Consecutive days for InstallatiOn supervision and 0 & M <br />Classes for the operators. <br /> <br />Conveyor (Cost $ 20,925.(0) <br /> <br />1- 41" wide by 22' -0" Mild Steel FPl Conveyor <br />1- Devoe Epoxy Coating <br />1 ~ 1 Hp 480V3phaseBaldorDrive Motor <br />1- 1 Hp Baldor Gear Reducer <br />1- Emergency cable pnll stop <br />PVC Dewatering belt <br /> <br />2. FPI Screen and Conveyor Installation <br />(inclndes crane for omoading of <br />machinery and apparatuses and <br />installation of screen, conveyor, <br />and all apparatuses, screen guides, <br />control panel, conduit, wire, and <br />plumbing) <br /> <br />LS <br /> <br />$20,000 <br /> <br />$20,000 <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />3. Galvanized Steel Bar Screen EA $15,000 $22,400 <br /> Trash Racks, with Welded <br /> and Bolted Connections <br /> Each Side ofFPI Screen <br /> (includes on:.site welding <br /> and making mechanical <br /> connections and crane for <br /> in-place installation) <br />MECHANICAIJELECfRlCAL QUANTITY <br />1. Power Installation/Connections from LS $10,000 $10,000 <br /> Existing Rural Area Power Source <br />SYSTEM INSTRUMENTATION <br />1. Leopold-Stevens Staff Gages EA $500 $1,000 <br /> Installed at Existing Inlet and <br /> Outlet Structures, installed <br /> <br />TOTAL ESTIMATED CONSTRUCTION COST $349,090 <br /> <br />SAY $350,000 <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />_. <br /> <br />- <br /> <br />- <br />