Laserfiche WebLink
<br />I <br />I <br />I <br /> <br />CONCEPTUAL COST ESTIMATE <br />FUSEPLUG <br /> <br />I <br /> <br />PROJECT: Dry Creek <br />PROJECT #6800024660.00 <br /> <br />I <br /> <br />NO. DESCRIPTION <br /> <br />I <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br /> <br />core material <br />sand and gravel <br />rip rap <br />crushed gravel <br />concrete cut-off wall <br />concrete divider wall <br /> <br />I <br />I <br /> <br />Subtotal <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />Mobilization/demobilization (10%) <br />Total <br />Design and Quantity Contingencies (30%) <br /> <br />FUSE PLUGS TOTAL <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />ESTIMATED BY: G. Glunz <br />DATE: 11/01/99 <br /> <br />QUANTITY UNIT <br /> <br />UNIT COST TOTAL COST <br /> <br />cubic yards <br />cubic yards <br />cubic yards <br />cubic yards <br />cubic yards <br />cubic yards <br /> <br />$40.00 <br />$50.00 <br />$75.00 <br />$40.00 <br />$350.00 <br />$500.00 <br /> <br />147 <br />905 <br />170 <br />107 <br />._-~-----_.-..- <br />351 <br />28 <br /> <br />$5,880 <br />$45,250 <br />$12,750 <br />$4,280 <br />$122,850 <br />$14,000 <br /> <br />$205,010 <br /> <br />$20,501 <br />$225,511 <br />$67,653 <br /> <br />$293,164 <br /> <br />