Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PROJECT: Dry Creek <br />PROJECT #6800024660.00 <br /> <br />NO. DESCRIPTION <br /> <br />1 <br />2 <br />3 <br /> <br />36 inch CMP <br />Installation <br />Road surfacing <br /> <br />Subtotal <br /> <br />CONCEPTUAL COST ESTIMATE <br />DRY CREEK ROAD CROSSING <br />ESTIMATED BY: G. Glunz <br />DATE: 11/01/99 <br /> <br />QUANTITY UNIT <br /> <br />1350 <br />1350 <br />1350 <br /> <br />MobilizationlDemobilization (10%) <br />Total <br />Contingencies/Unlisted Items (30%) <br />Upgrades for Conveyance <br /> <br />DRY CREEK ROAD CROSSING TOTAL <br /> <br />UNIT COST <br /> <br />ft <br />ft <br />ft <br /> <br />$40.00 <br />$12.00 <br />$4.00 <br /> <br />TOTAl COST <br /> <br />$54,000 <br />$16,200 <br />$5,400 <br /> <br />$75,600 <br /> <br />$7,560 <br />$83,160 <br />$24,948 <br />$90,000 <br /> <br />$198,108 <br /> <br />