Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />CONCEPTUAL COST ESTIMATE <br />Dam #5 <br /> <br />I <br /> <br />PROJECT: Dry Creek <br />PROJECT #6800024660.00 <br /> <br />ESTIMATED BY: G. Glunz <br />DATE: 11/01/99 <br /> <br />I <br /> <br />NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST <br /> General <br />1 Diversion structure 1 lump sum $2,000.00 $2,000 <br />2 Site Clearing and Grubbing 11 acres $5,000.00 $55,000 <br />3 Top soil excavation 6700 cubic yards $1.50 $10,050 <br />4 Trench excavation 11200 cubic yards $4.00 $44,800 <br />5 Embankment fill 43000 cubic yards $5.00 $215.000 <br />6 Outlet works <br />6a Reinforced concrete - box culvert 367 cubic yards $400.00 $146,800 <br />6b Reinforced concrete - wing walls and apron 700 cubic yards $400.00 $280,000 <br />7 Spillway <br />"la Reinforced concrete - cutoff walls 89 cubic yards $400.00 $35,600 <br />7b Overtopping protection - reventment blocks 9854 square feet $7.00 $68,978 <br />8 Stilling basin <br />8a Bedding 185 cubic yards $25.00 $4,625 <br />8b Riprap 555 cubic yards $50.00 $27,750 <br />9 Re-seeding 11 acres $3,000.00 $33,000 <br /> Subtotal $923,603 <br /> Mobilization/Demobilization (10%) $92,360 <br /> Total $1,015,963 <br /> Design and Quantity Contingencies (30%) $304,789 <br />10 Land Purchase and Flood Easements $280,000 <br /> ON-LINE DAM TOTAL $1,600,752 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br /> <br />I <br /> <br />I <br /> <br />I <br />