My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02019
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:39 AM
Creation date
7/9/2007 11:16:42 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0069FX
Contractor Name
Fountain, City of
Contract Type
Loan
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PREVIOUS STUDIES <br /> <br />W. W. Wheeler prepared a flood hydrology study for Keeton Dam in 1991. <br />This study evaluated the 100-year flood for the dam using the El Paso County <br />Drainage Criteria Manual (1987). The analysis determined that the 100-year flood <br />discharge would be 6,400 cfs. The study also evaluated the potential 100-year <br />flood on Little Fountain Creek using a limited period of actual stream flow record. <br />This alternative analysis indicated that the magnitude of the 100-year flood would <br />be approximately 1,500 cfs. The study concluded that the higher value was the <br />best estimate for the 100-year flood discharge. <br /> <br />W. W. Wheeler prepared a feasibility report that evaluates alternatives for <br />addressing the inadequate spillway capacity of the reservoir. This study was <br />released in draft form in May 2001. The results of that are incorporated into this <br />report. <br /> <br />Kumar and Associates, Inc. Geotechnical Engineers, of Colorado Springs, <br />performed a preliminary geologic reconnaissance of the Keeton Dam site in <br />November, 2000 (documented in a letter report dated April 23, 2001), and a <br />subsurface site investigation in mid-2001 (documented in a report dated October <br />18, 2001). These studies are summarized under the subsequent FIELD <br />INVESTIGATIONS section. <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.