My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02019
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:39 AM
Creation date
7/9/2007 11:16:42 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0069FX
Contractor Name
Fountain, City of
Contract Type
Loan
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />DESCRIPTION OF EXISTING FACILITY <br /> <br />General <br /> <br />In 1917, Fountain purchased the first 0.5-cfs of the Womack Ditch, which is <br />the most senior irrigation water right on Little Fountain Creek. During 1914, <br />Fountain constructed about seven miles of 8-inch pipeline for delivery of this water <br />to Fountain as part of the City's municipal water supply. However, this supply was <br />subject to numerous problems associated with variable streamflow, ice <br />accumulation, and sand bed load. In response to these problems, Fountain <br />constructed Keeton Dam in 1935 as a regulating reservoir just upstream of the <br />Womack Ditch intake. Water released through the outlet works of the dam was <br />delivered a short distance downstream to a settling pond at the Womack Ditch <br />diversion point. Water was re-diverted and delivered through about 2,000 feet of <br />pipe to the splitter house that had been constructed in about 1914. In the early <br />1950's, this re-diversion was eliminated when a new 12-inch steel pipeline was <br />constructed from the dam to the splitter house. The splitter house is the location <br />where the water is divided between Fountain and Fort Carson. <br /> <br />Use of Water <br />Approximately 200 acre-feet per year are obtained from Little Fountain Creek <br />through the Keeton Dam diversion for use by the City. The City uses the Keeton <br />water for augmentation of Fountain Creek wells, and also delivers water to several <br />private residences. Water is piped from below the reservoir for several miles to <br />Fountain Creek to be used to offset depletions from four City-owned wells in the <br />Fountain Creek alluvium. <br /> <br />Dam Facilities <br />The Keeton Dam and Reservoir site is owned by Fountain. It is located about <br />6.5 miles south of Colorado Springs, west of Colorado Highway No. 115, in <br />Section 2, T. 16 S., R. 67 W. According to the original 1935 construction drawings, <br /> <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.