My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02016
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:39 AM
Creation date
7/9/2007 10:31:53 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0070FX
Contractor Name
Union Ditch Company, The
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />Figure 6. Rubicon gate installation with SCADA <br /> <br />Figures 7 and 8 also show several other structures that can be used to improve water <br />control and regulation in canal systems. <br /> <br />Measurement Structures <br /> <br />Water measurement is one of the most important aspects in a canal modernization <br />project. External and internal pressures on canal companies are increasing the need for <br />better water measurement, including: <br /> <br />. Shortage of water supplies <br />. Labor shortage (implies automation) <br />. Environmental problems or impositions <br />. Accountability <br />. Improved operations <br />. Improved customer service (deliveries) <br /> <br />Aqua Engineering, Inc. <br />November 17, 2004 <br /> <br />Canal Modernization Study <br />- 15- <br />
The URL can be used to link to this page
Your browser does not support the video tag.