My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02016
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:39 AM
Creation date
7/9/2007 10:31:53 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0070FX
Contractor Name
Union Ditch Company, The
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />l.I:GEI\"D <br />II NATURf.LWAtERWAY5 <br />. DfVfRlfDWATUI. <br />. WATEA IN fIELDS <br />I CONfROUYSTeU <br />I'"""""""' <br />'\. SUtlSURf'ACERETURH <br />'. SURFACE RfTUfUf <br />o ~~7: <br />II COfIl'ROlSYSlU <br /> <br />....,.~ <br /> <br />FiolJrA 5. Ontinn~ fnr r.~n~1 mnrlp.rni7~tinn <br /> <br />Improvements to Control. Reaulation. and Measurement <br /> <br />Control and Reaulation Structures <br /> <br />Check structures have historically been used in canal systems for both depth and flow <br />management. By "checking" the canal, the water level upstream of the check structure <br />can be set to provide the necessary water surface elevation to upstream users. <br />Additionally, check structures can increase and regulate in-channel storage. Efficiently <br />utilizing a system of checks along a canal system can help create a "pencil-thin" <br />reservoir and can improve "on-demand" delivery capabilities. Control of each structure is <br />critical for this precision of operation. Incorporating check structures and SCADA <br />systems for control of the delivery system is beneficial. <br /> <br />A radial gate manufactured by Rubicon is an example of combining control, regulation, <br />SCADA, and measurement into a single structure for canal conveyance improvements. <br />These gates can be installed in existing concrete check structures or at new locations. <br />SCADA is included in the gate assembly for monitoring and control of the gate. The <br />Rubicon gate manufacturer also reports a flow measurement accuracy of 2: 2%. For <br />locations where both control and flow measurement are desired, a Rubicon gate may be <br />the most feasible structure rather than installing a separate long-throated flume and a <br />separate check and gate structure. Figure 6 is a photograph of three Rubicon gates <br />installed in an existing check structure. <br /> <br />Aqua Engineering, Inc. <br />November 17, 2004 <br /> <br />Canal Modernization Study <br />-14- <br />
The URL can be used to link to this page
Your browser does not support the video tag.