My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02016
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:39 AM
Creation date
7/9/2007 10:31:53 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0070FX
Contractor Name
Union Ditch Company, The
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />Figure 7. A Langemann gate that can be used as a check on the canal <br />and as a flow measurement structure as well. <br /> <br /> <br />Figure 8. A "duck bill" check structure is shown here. This type of check <br />is useful in maintaining a fairly constant upstream water surface <br />elevation and excess flows are accommodated by a long crested <br />weir. Although the screw gate is not automated with SCADA, the <br />wet wells upstream and downstream have been installed in <br />anticipation of future SCADA implementation. <br /> <br />Aqua Engineering, Inc. <br />November 17, 2004 <br /> <br />Canal Modernization Study <br />- 16- <br />
The URL can be used to link to this page
Your browser does not support the video tag.