Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />Table 12 <br /> <br />w <br /> <br />I <br /> <br />Preliminary Opinion of Probable Phased Construction Cost <br />May 19, 2004 <br />City of Lamar Secondary Supply <br />Pressurized Transmission System <br /> <br />I <br /> <br />I <br /> <br />Phase 5 <br /> UNIT TOTAL <br />ITEM DESCRIPTION QUANTITY UNIT COST COST <br />TRANSMISSION SYSTEM <br />4-inch C900 PVC 7,669 LF $10.00 $76,690 <br />6-inch C900 PVC 4,858 LF $15.00 $72,870 <br />8-inch C900 PVC 6,957 LF $20.00 $139,140 <br />lO-inch C900 PVC 286 LF $25.00 $7,150 <br />12-inch C900 PVC 5,440 LF $25.00 $136,000 <br />14-inch C905 PVC 0 LF $32.00 $0 <br />16-inch C905 PVC 1,147 LF $32.00 $36,704 <br />18-inch C905 PVC 385 LF $35.00 $13,475 <br />20-inch C905 PVC 0 LF $45.00 $0 <br />24-inch C905 PVC 0 LF $60.00 $0 <br />30-inch C905 PVC 0 LF $90.00 $0 <br />36-inch C905 PVC 0 LF $125.00 $0 <br />Pipe fittings - estimated at 10% of Total Pipe Costs 1 LS $48,203 <br />Isolation Gate Valves 1 LS $250,000.00 $10,605 <br />Blow-off assembly 4 Ea. $1,000.00 $4,000 <br />Standard 2" Air-Vacuum Relief valve 2 Ea. $5,500.00 $11,000 <br />Pressure Reducing I Sustaining Valve Assemblies 1 Ea. $50,000.00 $50,000 <br />SUBTOTAL - TRANSMISSION SYSTEM $605,837 <br />DISTRIBUTION SYSTEM <br />2.5-inch CL 200 PVC 38,800 LF $7.50 $291 ,000 <br />Pipe Contingency - estimated at 5% of Total Pipe Costs 1 LS $14,550 <br />Pipe fittings - estimated at 10% of Total Pipe Costs 1 LS $29,100 <br />Taps and Service Stubs at Single-family Residences 820 EA $1,000.00 $820,000 <br />Taps and Service Stubs at Non Single-family Residences 104 EA $2,000.00 $208,000 <br />Taps and Service Stubs at Institutions and Parks 19 EA $10,000.00 $190,000 <br />Taps and Service Stubs at Commercial and Industrial 109 EA $1,000.00 $109,000 <br />SUBTOTAL - DISTRIBUTION SYSTEM $1,661,650 <br />TOTAL $2,267,487 <br />Construction Contingency (7.5% of Total Construction Cost) $170,100 <br />Engineering Design Fees (6% of Subtotal) $136,000 <br />IGRAND TOTAL $2,573,5871 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Aqua Engineering, Inc. <br />and Colorado State University <br />May 19, 2004 <br /> <br />Secondary Supply Feasibility Study <br />-41- <br /> <br />I <br />