Laserfiche WebLink
<br />I <br />I <br /> Table 13 W <br />I Preliminary Opinion of Probable Phased Construction Cost <br />May 19, 2004 <br /> City of Lamar Secondary Supply <br />I Pressurized Transmission System <br />Phase 6 <br /> UNIT TOTAL <br />I ITEM DESCRIPTION QUANTITY UNtT COST COST <br />STORAGE AND PUMP SYSTEMS <br /> Phase Six <br />I Middle Well Pump Station (710 GPM @ 90 PSI) 1 LS $75,000.00 $75,000 <br />Intake system, building, and electrical 1 LS $40,000.00 $40,000 <br />Middle Well Storage Pond (4.09 acre-feet) 7,260 CY $1.50 $10,890 <br /> Pond Liner 3579 SY $0.00 $0 <br />I Aeration and Ozone System 1 LS $10,000.00 $10,000 <br />Well Drilling 1 LS $0.00 $0 <br />Phase Six <br /> East Well Pump Station (1,774 GPM @ 90 PSI) 1 LS $100,000.00 $100,000 <br />I Intake system, building, and electrical 1 LS $50,000.00 $50,000 <br />East Well Storage Pond (9.98 acre-feet) 17,698 CY $1.50 $26,547 <br />Pond Liner 7291 SY $0.00 $0 <br /> Aeration and Ozone System 1 LS $15,000.00 $15,000 <br /> Well Drilling 1 LS $0.00 $0 <br />I SUBTOTAL - PUMP SYSTEMS AND STORAGE $327,437 <br /> TRANSMISSION SYSTEM <br />I 4-inch C900 PVC 7,140 LF $10.00 $71,400 <br />6-inch C900 PVC 2,515 LF $15.00 $37,725 <br />8-inch C900 PVC 4,879 LF $20.00 $97,580 <br /> 10-inch C900 PVC 0 LF $25.00 $0 <br />I 12-inch C900 PVC 6,848 LF $25.00 $171,200 <br />14-inch C905 PVC 4,000 LF $32.00 $128,000 <br />16-inch C905 PVC 350 LF $32.00 $11,200 <br /> 18-inch C905 PVC 0 LF $35.00 $0 <br /> 20-inch C905 PVC 0 LF $45.00 $0 <br />I 24-inch C905 PVC 0 LF $60.00 $0 <br />30-inch C905 PVC 0 LF $90.00 $0 <br />36-inch C90S PVC 0 LF $125.00 $0 <br /> Pipe fittings - estimated at 10% of Total Pipe Costs 1 LS $51,711 <br />I Isolation Gate Valves 1 LS $11,376 <br />Blow-off assembly 4 Ea. $1,000.00 $4,000 <br />Standard 2" Air-Vacuum Relief valve 2 Ea. $5,500.00 $11,000 <br /> Pressure Reducing I Sustaining Valve Assemblies 1 Ea. $50,000.00 $50,000 <br />I SUBTOTAL - TRANSMISSION SYSTEM $645,192 <br />DISTRIBUTION SYSTEM <br /> 2.5-inch CL 200 PVC 38,270 LF $7.50 $287,025 <br />I Pipe Contingency - estimated at 5% of Total Pipe Costs 1 LS $14,351 <br />Pipe fittings - estimated at 10% of Total Pipe Costs 1 LS $28,703 <br />Taps and Service Stubs at Single-family Residences 382 EA $1,000.00 $382,000 <br /> Taps and Service Stubs at Non Single-family Residences 98 EA $2,000.00 $196,000 <br />I Taps and Service Stubs at Institutions and Parks 12 EA $10,000.00 $120,000 <br />Taps and Service Stubs at Commercial and Industrial 80 EA $1,000.00 $80,000 <br /> SUBTOTAL - DISTRIBUTION SYSTEM $1,108,079 <br />I TOTAL $2,080,708 <br />Construction Contingency (7.5% of Total Construction Cost) $156,100 <br />Engineering Design Fees (6% of Subtotal) $124,800 <br />I IGRAND TOTAL $2,361,6081 <br />Aqua Engineering, Inc. <br /> and Colorado State University Secondary Supply Feasibility Study <br />I May 19, 2004 -42- <br />