Laserfiche WebLink
<br />I <br />I <br /> Table 11 W <br />I Preliminary Opinion of Probable Phased Construction Cost <br />May 19, 2004 <br />I City of Lamar Secondary Supply <br />Pressurized Transmission System <br /> Phase 4 <br />I UNIT TOTAL <br />ITEM DESCRIPTION QUANTITY UNIT COST COST <br /> STORAGE AND PUMP SYSTEMS <br />I Phase Four <br />West Pump Station (3,548 GPM @ 90 PSI) 1 LS $150,000.00 $150,000 <br /> Intake system, building, and electrical 1 LS $75,000.00 $75,000 <br />I West Storage Pond (19.6 acre-feet) 34,832 CY $1.50 $52,248 <br />Pond Liner 1 LS $5,000.00 $5,000 <br />Aeration and Ozone System 1 LS $25,000.00 $25,000 <br /> SUBTOTAL - PUMP SYSTEMS AND STORAGE $307,248 <br />I TRANSMISSION SYSTEM <br /> 4-inch C900 PVC 1,159 LF $10.00 $11,590 <br /> 6-inch C900 PVC 0 LF $15.00 $0 <br />I 8-inch C900 PVC 0 LF $20.00 $0 <br />10-inch C900 PVC 0 LF $25.00 $0 <br />12-inch C900 PVC 0 LF $25.00 $0 <br /> 14-inch C905 PVC 0 LF $32.00 $0 <br />I 16-inch C905 PVC 765 LF $32.00 $24,480 <br />18-inch C905 PVC 6,324 LF $35.00 $221.340 <br />20-inch C905 PVC 5,098 LF $45.00 $229,410 <br /> 24-inch C905 PVC 0 LF $60.00 $0 <br />I 30-inch C905 PVC 0 LF $90.00 $0 <br />36-inch C905 PVC 0 LF $125.00 $0 <br />Pipe fittings - estimated at 10% of Total Pipe Costs 1 LS $48.682 <br /> Isolation Gate Valves 1 LS $10,710 <br />I Blow-off assembly 4 Ea. $1,000.00 $4,000 <br />Standard 2" Air-Vacuum Relief valve 2 Ea. $5,500.00 $11,000 <br />Pressure Reducing I Sustaining Valve Assemblies 1 Ea. $50,000.00 $50,000 <br />I SUBTOTAL - TRANSMISSION SYSTEM $611,212 <br />DISTRIBUTION SYSTEM <br /> 2.5-inch CL 200 PVC 42,210 LF $7.50 $316,575 <br /> Pipe Contingency - estimated at 5% of Total Pipe Costs 1 LS $15,829 <br />I Pipe fittings - estimated at 10% of Total Pipe Costs 1 LS $31,658 <br />Taps and Service Stubs at Single-family Residences 716 EA $1,000.00 $716,000 <br />Taps and Service Stubs at Non Single-family Residences 54 EA $2,000.00 $108,000 <br /> Taps and Service Stubs at Institutions and Parks 7 EA $10,000.00 $70,000 <br />I Taps and Service Stubs at Commercial and Industrial 31 EA $1,000.00 $31,000 <br />SUBTOTAL - DISTRIBUTION SYSTEM $1,289,061 <br />I TOTAL $2,207,521 <br />Construction Contingency (7.5% of Total Construction Cost) $165,600 <br /> Engineering Design Fees (6% of Subtotal) $132,500 <br />I IGRAND TOTAL $2,505,6211 <br />I Aqua Engineering, Inc. <br /> and Colorado State University Secondary Supply Feasibility Study <br />I May 19, 2004 -40- <br />