Laserfiche WebLink
<br />~ <br /> <br />to cluster meetings with other working ~oups on the same day and in the same <br />location. I <br /> <br />Fundine i <br />Funding may come from a variety of sources. The souFce of funding has not yet been solidified. <br /> <br />Relevant Studies and Plans I <br />The group identified some of the plans, studies, and other documents addressing Fountain Creek <br />that are currently underway. These documents, in no p~rticular order, include: <br />. Projects with Approximate Dates ofCompleti04 <br />o Environmental Protection Agency (EP A) Watershed Capacity Building Grant <br />Application I <br />o E coli. Study (phase I complete 312007)1 <br />o Watershed Reach Analysis (3/2007) I <br />o Army Corps of Engineers study i <br />· Hydrology, hydraulics, and geo~orphology (completed) <br />· Environmental assessment (completed) <br />· Formulation of alternatives and evaluation (12/2007, contingent on funds) <br />o 208 Plan (on point and non-point source~ of pollutants in Fountain; 2008) <br />o Transit model- Fountain Utilities : <br />i <br />o Army use buffer study i <br />o Waste water management plan <br />o U.S. Geological Survey studies <br /> <br />. <br /> <br />. <br /> <br />. Completed Documents <br />o Fountain Creek Watershed Plan <br />o Fountain Creek Conflict Assessment <br />o Senator Salazar's vision <br />o Petros vision <br /> <br />. Ongoing Efforts <br />o Peaks to Prairie Conservation Plan <br />o Front Range Trail <br /> <br />i <br />. Other plans and studies that might be relevant of instructive <br />o Cherry Creek Watershed Plan I <br />o Other watershed plans : <br />o Pueblo reservoir plan <br />o Private engineering plans ! <br />o Community, city, county development p~ans <br />I <br />I <br />I <br /> <br />. <br />