Laserfiche WebLink
<br />.ii <br /> <br />. <br /> <br />.1 <br /> <br />This lack of production resulted in the residence having to haul water to meet their <br />demands. This project involves the replacement of the existing well with a new 950-foot <br />deep well that will produce at the original pump rate of 30 gpm. Reaksecker Drilling, <br />Sadalia, Colorado, has completed the drilling, casing, and installation of the pump, and <br />all electrical work. Unfortunately, the Company's new well is only producing around 5 <br />GPM. This lack of production has resulted in the Company requesting approval from <br />the SEO to operate both the old and the new well together to increase production to over <br />10 GPM. The Company is waiting on a formal decision by the SEO. <br /> <br />24. Number Six Ditch Company - Ditch Rehabilitation <br /> <br />Authorization: Severance Tax Fund <br />Water Source: Mancos River <br />Terms of Loan: $688,942@ 2.5% for 30 yrs. <br /> <br />County: Montezuma <br />Project Yield: 2,591 AF <br />Project Type: Ditch Rehabilitation <br /> <br />The Number Six Company is comprised of 23 members that manage 5.5 miles of open <br />ditch, with an annual diversion of approximately 2,591 cfs and a 540 acre service area. <br />This project in~olves piping the 5.5 miles of ditch with 4-inch to 24-inch PVC Pipe to <br />create a pressurized system for the users. The project is a joint effort with NRCS's <br />Salinity Control Program. NRCS is contributing 75% of the cost towards the design and <br />construction of the project. The project has been awarded to Lewis Excavating, Mancos, <br />Colorado and is currently under construction. The project is approximately 95% <br />complete. <br /> <br />25. Mancos Valley Beaver Ditch Company - Ditch Rehabilitation Project <br /> <br />Authorization: Severance Tax Fund <br />Water Source: Mancos River <br />Terms of Loan: $904,500 @ 2.5% for 30 yrs. <br /> <br />County: Montezuma <br />Project Yield: 1,431 acre-feet <br />Project Type: Ditch Rehabilitation <br /> <br />The Mancos Valley Beaver Ditch Company manages the Beaver Ditch for 4 members <br />that own water rights and land served by the Ditch. The existing ditch system is <br />comprised of an open, grass-lined channel, approximately 4.6 miles in length, with a <br />carrying capacity of 10.5 cfs. This project involves enclosing the existing ditch with 10- <br />18-inch PVC pipe, with metered delivery points. The project is being design by NRCS <br />Cortez Office and is anticipated to commence construction in spring of 2006. The <br />project loan was amended at the January 2006 Board Meeting from $413,000 to $904,500, <br />to cover increase pipe costs and items not included in the original cost estimate. Pipe <br />for the project has been purchased and delivered. The project has been awarded to <br />Lewis Excavating, Mancos, Colorado, who has commenced construction. The project is <br />approximately 95% complete. <br /> <br />55 <br />