My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00179 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00179 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:46:28 PM
Creation date
7/6/2007 10:39:08 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/23/2007
Description
Director's Report - CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br /> <br />Terms of Loan: $312,595 @2.50% for320-yearsl Project Type: Well Augmentation <br /> <br />The Union Ditch Company provides irrigaiion water to an area of 5,500 acres east of <br />I <br />the Town of LaSalle and south of Greeley. IThe Union Ditch Company has filed <br />application for an augmentation plan to pr~)Vide replacement water for 40 junior <br />wells owned by the shareholders, formerlyiserviced by GASP. This project involves <br />I <br />the development of 3 recharge ponds, placement of flow measurement devices, and <br />headgate structures into the ponds. The pbnds will be filled by gravity flow from <br />I <br />the Union Ditch. Union Ditch Company is currently constructing one recharge <br />I <br />pond at the Miller Feedlot Site with an accqmpany diversion structure on the Union <br />Ditch. The overall augmentation efforts ar~ anticipated to be completed by the fall <br />I <br />of 2007. <br /> <br />. <br /> <br />I <br /> <br />I <br />22. Pinewood Springs Water District - ~aw Water Pipeline <br />I <br />I <br />I <br />I <br />Authorization: Severance Tax Fund i County: Larimer <br />Water Source: South Platte I Project Yield: 51 acre-feet <br />Terms of Loan: $2,033,850 @4.0% for 30 yrs. I Project Type: Raw Water <br /> <br />The Pinewood Springs Water District is located ~ast of Estes Park on US 36 and provides <br />I <br />water to 268 taps with a projected build out of 35p taps. Their current water supply is from <br />I <br />the Little Thompson River, which they treat withj a micro-filtration unit. The District has <br />no water storage and has been greatly impacted by the on-going drought. This project <br />will provide the following water components: cdnstruction of 51 acre-foot Crow Lane <br />Reservoir No.1, a new pump station, 5500 linear Ifeet of 6-inch transmission pipe, <br />modifications to their infiltration gallery, and the!purchase of 90 shares of CBT water. The <br />pipeline portion of the project was bid in April o~ 2006, with the low bidder being Temple <br />Construction, at a bid price of $510,000. This wqrk has been completed. Work on the <br />pump station commenced in the fall of 2006 and ~as been completed and tested. The <br />construction of the reservoir has been delayed d~e land acquisition problems and final SEO <br />review. The overall project is anticipated to be c9mplete and operational by December of <br /> <br />. <br /> <br />2007. <br /> <br />23. <br /> <br />I <br />Hope Ditch Company - Well Replacement <br />I <br />I <br />I County: Adams <br />, Project Yield: 11.5 AF <br />Project Type: Well Replacement <br /> <br />Authorization: Construction Fund <br />Water Source: Well- Denver Basin <br />Terms of Loan: $153,OOO@3.75% for 30 yrs. <br /> <br />The Hope Ditch Company provides water to a Piortion of the Wiesner Subdivision, <br />located in Adams County. The Company's existing well drilled in 1963, provided <br />I <br />domestic water to 23 homes in the subdivision. lOver the years the existing well casing <br />has significantly deteriorated, causing the well ~roduction to go from 30 gpm to 7 gpm. <br /> <br />. <br /> <br />54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.