My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00179 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00179 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:46:28 PM
Creation date
7/6/2007 10:39:08 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/23/2007
Description
Director's Report - CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />Town of Keensburg - Raw Water Pipeline and Well Purchase <br />I <br />I <br />I <br />I <br />! <br /> <br />I <br />I <br />I <br />The Town of Keenesburg is located in Weld C~unty 30 miles north of Denver on 1-76. <br />The population is 1100, and the Town currently serves about 461 water taps. The water <br />supply comes from 5 wells that draw water frob the Laramie - Fox Hills aquifer, and <br />I <br />have a total capacity of 221 acre-feet per year. The Town's well water is pumped <br />I <br />directly into the distribution system, which resplts in some users not receiving proper <br />disinfection contact time. The Town has undertaken a separate project that will allow <br />I <br />well water to be pumped to the water storage tlmk prior to being delivered to <br />I <br />distribution. The proposed project with CWCa funds, includes purchase of 139.6 AF of <br />well water rights in the Lost Creek Groundwat~r Basin, and construction of 5.5 miles of <br />pipeline to the Town. The purpose of the projJct is to improve the water quality by <br />I <br />blending the new water with the existing Laraf1lie-Fox Hills water. Blending the water <br />has been evaluated, and providing a 50%-50% Jjlend of the two waters shows that the <br />SAR ratio drops below 10, and the fluoride lev~l drops to approximately 1.5 mg/l, below <br />the MCL of 2 mg/l. The well and water rights purchase has been completed. The <br />Town has completed all the pipeline work and is currently working on the connection to <br />I <br />the storage tank. Project completion is anticipated in July of 2007. <br />I <br />27. South Side Irrigation Company - South Side Reservoir Rehabilitation <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />The South Side Reservoir Company operates the South Side Reservoir, which provides <br />I <br />irrigation water within a l,590-acre service area.: The South Side Reservoir is located <br />approximately 1 mile southwest of the City of L~veland. This $400,000 project involves <br />rehabilitation of the outlet structure and spillway. These improvements will eliminate <br />the current storage restrictions imposed by the State Engineers Office. Project <br />construction has been awarded to Zak Dirt, Lon~mont, Colorado, who completed <br />approximately 75% of the work. The project is anticipated to be complete by July of <br />2007. I <br /> <br />I <br /> <br />28. Bijou Irrigation District - Reservoir ~ehabi1itation <br />I <br /> <br />26. <br /> <br />Authorization: Construction Fund <br />Water Source: South Platte River <br />Terms of Loan: $l,523,080@3.75% for 30 yrs. <br /> <br />Authorization: Construction Fund <br />Water Source: South Platte River <br />Terms of Loan: $360,OOO@3.1O%for30yrs. <br /> <br />Authorization: Severance Tax Fund <br />Water Source: South Platte River <br /> <br />56 <br /> <br />County: Weld <br />Project Yield: 140 AF <br />Project Type: Pipeline/Well <br /> <br />. <br /> <br />. <br /> <br />County: Larimer - Near Loveland <br />Project Yield: 1,241 acre-feet <br />Project Type: Reservoir Rehabilitation <br /> <br />County: Morgan/Weld <br />Project Yield: 19,900 acre-feet <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.