My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01984
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:05:09 AM
Creation date
7/3/2007 11:20:01 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0065FX
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The Town will be given a large format, mounted and laminated photograph of the Town of <br />Wellingto~ at 1" = 600'. The photo will be USGS quadrangle map rectified and may be provided <br />in a digital format for use with the Town's Geographic Information System (GIS). <br /> <br />Deliverable Work Products: <br /> <br />6) One set of aerial photograph contact prints <br />7) One set of electronic map file(s) <br />8) One set of reproducible maps <br /> <br />Task 3 - SurveYing <br /> <br />Additional surveying shall be completed, as needed, to locate important features to be used as <br />part of the analysis. Examples of additional surveyed area may be around the Windsor C~ the <br />I-25 bridge, other bridges through To~ existing culverts and existing site features along Box <br />Elder Creek. <br /> <br />NoltelEDRC will identify areas where additional survey information is needed to perform the <br />hydraulic analysis for the Feasibility Report. Examples of additional survey information that may <br />be required are irrigation cross-sections, culvert sizes and lengths or street cross-section data <br />The data gathered under this task will be collected in electronic format. <br /> <br />The surveying needed for the Storm Drainage Master Plan has been noted in Task 5. Completed <br />under this task is the surveying of the existing local drainage system features and other given <br />points of interest. <br /> <br />Deliverable Work Products: <br /> <br />9) An electronic file of survey points <br /> <br />Task 4 - Hydrology and Hydraulic Analysis of Preferred Alternative <br /> <br />The preferred ahernative is to direct flows from Coal Creek around the Town of Wellington and <br />outfall to Boxelder Creek. The hydrologic analysis will be completed using the adopted <br />hydrologic model(s) available from Colorado Water Conservation Board (CWCB) and the <br />Natural Resources Conservation Service (NRCS). The models and associated reports will be <br />used to provide input to the hydraulic models for the proposed preferred alternative. <br />Conceptually, this alternative will create a by-pass channel to convey flood flows from the Coal <br />Creek basin around the Town of Wellington and outfall to Boxelder Creek. It is anticipated that <br />the hydraulic analysis will include preliminary engineering calculations, and computer modeling, <br />including water surface modeling. These efforts will define the size, configuration and location <br />of the preferred ahernative. An estimate of project construction cost will be provided. The <br />estimate of costs will be used to compare all ahernatives that have been previously studied. <br /> <br />08131/00 <br /> <br />5 <br /> <br />G:\Fisher\proposal\Hoffinann 2000\FC5 _ OO.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.