My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01938
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01938
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:48 AM
Creation date
7/2/2007 11:17:41 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150012
Contractor Name
Model Land and Irrigation Company, The
Contract Type
Loan
Water District
19
County
Las Animas
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />." <br />~J <br /> <br />), <br /> <br />ST ATE OF COLORADO <br /> <br />,A' <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />Q <br /> <br />Bill Owens <br />Governor <br /> <br />February 16, 2000 <br /> <br />Greg E.Walcher <br />Execu tive Director <br /> <br />Mr. Terry Arnold, P.E. <br />URS Greiner Woodward Clyde <br />4582 South Ulster Street, Suite 100 <br />Denver, CO 80237 <br /> <br />Peter H. Evans <br />CWCS Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Re: Model Dam Feasibility Study <br /> <br />Dear Terry: <br /> <br />Enclosed is a memo summarizing our fmal comments on the Feasibility Report, Black Hills Reservoir Dam <br />(Model Dam). <br /> <br />In addition, we would like to resolve the following items prior to finalizing the loan contract with the <br />Model Land and Irrigation Co.: <br /> <br />New articles of incorporation and bylaws for the MLlC, <br /> <br />Quantification of the MLlC water rights to be pledged as collateral for the loan (net of transfers), <br /> <br />Consent of the Purgatoire River Water Conservancy District to MLlC granting a security interest <br />to the CWCB in the two allotment contracts, <br /> <br />An agreement with the Division 2 Engineer regarding measuring devices and control structures for <br />Model Reservoir. <br /> <br />Please let me know if you have any questions. <br /> <br />Sincerely, <br /> <br />-p~~ <br /> <br />William E. Green, P .E. <br />Manager of Planning <br />Water Project Planning and Finance <br /> <br />Enclosure <br /> <br />Cc: Mike Serlet <br />Jan Illian <br />Bob Trout, Trout & Raley <br />Steve Witte, Division 2 <br />Linda Bassi, AGO <br />
The URL can be used to link to this page
Your browser does not support the video tag.