Laserfiche WebLink
<br />, :.'" <br /> <br />STATE OF COLORADO <br /> <br />;,' <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />Q <br /> <br />Bill Owens <br />Governor <br /> <br />FEASIBILITY STUDY REVIEW MEMO <br /> <br />February 17, 2000 <br /> <br />Greg E,Walcher <br />Executive Director <br /> <br />Report: Feasibility Report, Black Hills Reservoir Dam (Model Dam) <br /> <br />Peter H. Evans <br />CWCB Director <br /> <br />Consultant: URS Greiner Woodward Clyde <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Reviewer: Bill Green <br /> <br />1. On page 4-1, in item no. 4, is the Hoehne Ditch priority date of October 7, 1965 <br />correct? <br /> <br />2. In the last sentence of the first paragraph on page 4-3, is a date (year) missing? <br /> <br />3. On page 6-4, do the paragraphs on Embankment Modifications describe the work <br />required for the breach repair or for the work previously proposed? <br /> <br />4. On page 7-1, a bullet should be added for embankment repair. <br /> <br />5. In the last paragraph on page 8-1, change "Conservation District" to "Conservancy <br />District" . <br /> <br />6. In Table 8-4, a column should be added for the Debt Service Reserve Fund. CWCB <br />contracts require a debt service reserve fund equal in amount to one annual loan <br />payment. The fund may be accumulated over a period of ten years. <br /> <br />7. In the next to the last sentence on page 9-1, the net value of agricultural production <br />from the project should be compared with the total proiect cost and not the annual <br />payment on the CWCB loan as noted in our December 1999 Feasibility Study Review <br />Memo. This can be done by annualizing the total project cost of$910,175 at an <br />appropriate interest rate for 30 years and comparing the result (annual Cost) with the <br />net project benefit. <br /> <br />8. In the last paragraph on page 10-1, replace the words "loan repayment costs" with <br />"annual project costs" to correspond with item no. 7, above. <br />