My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150154 Feasibility
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C150154 Feasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:58:50 AM
Creation date
6/28/2007 9:26:25 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150154
Contractor Name
Pine River - Bayfield Ditch Company
Contract Type
Loan
Water District
31
County
La Plata
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Implementation Schedule <br /> <br />Appendix D provides an implementation schedule for Alternative 3. <br /> <br />It is anticipated that the work on the siphon will be initiated in September or October of 2003. <br />The initiation of construction could possibly be expedited because of the water shortage <br />anticipated for the 2003 irrigation season. Other factors that will determine the start of <br />construction include 1) available funding and 2) completion of the construction geological survey <br />and designs. <br /> <br />Permitting <br /> <br />The Pine River Bayfield Ditch Company is currently working with the CORP of Engineers office in <br />Durango, Colorado to complete the 404 (b)(1) permitting process. No delays are anticipated in <br />the replacement schedule that would be attributed to the permitting process. <br /> <br />The rights-of-way associated with each alternative have been discussed with the three property <br />owners that would be impacted by the siphon replacement. All landowners are in agreement and <br />have committed to cooperating with the Pine River Bayfield Ditch Company in the replacement <br />effort. <br /> <br />I nstitutional Considerations <br /> <br />Entities that are, or may be, involved in the design, construction, and financing of the project <br />include: <br /> <br />PRB Ditch Company: financing and project management. <br />Natural Resources Conservation Service (NRCS): surveying, design and construction. <br />Colorado Water Conservation Board (CWCB): financing and construction, <br /> <br />The PRBDC will be the lead for the financing, design, and construction of the project and will be <br />the entity entering into contracts and agreements with the various entities for the services <br />provided by each. <br /> <br />Financial Analysis <br /> <br />Three entities will be involved in financing the estimated total project cost of $267,000. The <br />PRBDC is applying for a loan from the CWCB in maximum amount of $200,000. The actual or <br />estimated amounts by entity are given in Table 2. <br /> <br />Table 2. Sources of Funding <br /> <br />Entity Grant Loan Local Percent <br /> Funds Participation <br />CWCB $0 $200,000 76% <br />PRBDC $0 $0 $17,000 6% <br />NRCS $50,000 $0 18% <br />Totals $50,000 $200,000 $17,000 <br /> <br />PRB Ditch Company <br />Siphon Replacement Feasibility Study <br />June 2003 <br /> <br />Page 10 of15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.