Laserfiche WebLink
<br />Table 11-2: Projected Growth Rates for Montezuma County and Estimated <br />Goodman Point Population Based on County Growth Rate <br /> <br />Year Projected Estimated <br />Growth Rate POllulation <br />2000 - 59 <br />2005 1.2% 64 <br />2010 2.1% 77* <br />2015 2.1% 85 <br />2020 1.9% 93 <br />2025 1.7% 102 <br />2030 1.5% 110 <br /> <br />* Includes plmmed construction of five homes as a result of the proposed <br />project fix a projected growth of 20% <br /> <br />Figure 11-3: Projected Population of Goodman Point <br />Over the Life of the Proposed Project <br /> <br />Projected Population and Water Demand <br /> <br /> 130 <br /> 120 <br /> 110 <br /> 100 <br />r::: <br />0 90 <br />:;::::; <br />III <br />::::J 80 <br />a. <br />0 <br />a. <br /> 70 <br /> 60 <br /> 50 <br /> 40 <br /> 2000 <br /> <br /> <br />2005 <br /> <br />2010 <br /> <br />2015 <br /> <br />2020 <br /> <br />2025 <br /> <br />2030 <br /> <br />2035 <br /> <br />2040 <br /> <br />Year <br /> <br />j-+-- Projected Population j <br /> <br />Most homes are located on 35 acre parcels and there are currently no subdivided parcels <br />in the project area. Therefore, it is unlikely that the Goodman Point area has seen, or will <br />see, a growth rate higher than what is indicated above. <br /> <br />Goodman Point Water Association - Preliminaty Engineering RepOli <br /> <br />5 <br />