Laserfiche WebLink
<br />9J\lC <br /> <br />SMITH WILLIAMS CONSULTANTS, INC. <br /> <br />December 18, 2006 <br />Proposal P06-078 <br /> <br />Orchard City Reservoir Proposal for Engineering Services <br /> <br />The drawings and specifications will be completed in accordance with the SEa guidelines. The <br />package will allow Orchard City the opportunity to review the construction documents prior to <br />submittal to the SEa, bidding and construction_ <br /> <br />Review comments related to the draft final design will be incorporated into a fmal design report. <br />Engineer will submit five (5) copies of the fmal design report. In addition, the Engineer will <br />provide an electronic version of the report and associated documents on a compact disc (CD) in <br />pdfformat that is compatible with Orchard City's computer system. <br /> <br />Task A600: Dam Safety Application <br /> <br />Engineer will assist Orchard City in obtaining approval to construct the Dam from the Colorado <br />State Engineer's Office (SEa).. As required, the Engineer will contact the SEa, prepare the <br />documents for Orchard City review and obtain Orchard City's approval for the SEa application <br />to construct a dam. The engineer will address any questions regarding the application with the <br />SEa and make the necessary revisions. The required documents for the SEa approval to <br />construct a new dam include the following: <br /> <br />. <br /> <br />Application Form <br />Design Drawings <br />Specifications <br />Design report consisting of <br />Hydrology report <br />Geotechnical report <br />Instrumentation Plan <br />Engineer's cost estimate <br />Filing fee <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Following approval for construction, put prior to fmal inspection of the Dam, the following <br />documents need to be prepared and, submitted to the SEO for approval before initial filling of <br />the reservoir may begin: - <br /> <br />. <br /> <br />Construction Report <br />Initial Filling Plan <br />Long-term monitoring plan <br />Emergency Preparedness Plan <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Supporting information for the information listed above consists of but is not limited to dam <br />failure inundation maps and an Instrumentation Monitoring and Reporting Plan. These items are <br />not included in the Final Design Scope of Work. <br /> <br />It should be noted that members of our team have favorable relationships with the SEOand have <br />worked with most of the current SEO staff on a number of recent dam designs and <br /> <br />5:\PROPOSALS\2006 PROPOSALS\P06-078 - ORCHA~.D CITY RESERVOI R\P00-078 -ORCHARO CiTY RESERVOIR. DOC <br /> <br />7 <br />