My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gunnison - Orchard City Water Reservoir Project (Remaining Tasks)_Application
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Gunnison - Orchard City Water Reservoir Project (Remaining Tasks)_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 5:04:49 PM
Creation date
4/17/2007 1:53:04 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Gunnison
Applicant
Town of Orchard City
Description
Water Reservoir Project (Remaining Tasks)
Account Source
Statewide
Board Meeting Date
9/19/2007
Contract/PO #
150410
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />9J\lC <br /> <br />SMITH WILLIAMS CONSULTANTS, INC. <br /> <br />December 18, 2006 <br />Proposal P06-078 <br /> <br />Orchard City Reservoir Proposal for Engineering Services <br /> <br />The drawings and specifications will be completed in accordance with the SEa guidelines. The <br />package will allow Orchard City the opportunity to review the construction documents prior to <br />submittal to the SEa, bidding and construction_ <br /> <br />Review comments related to the draft final design will be incorporated into a fmal design report. <br />Engineer will submit five (5) copies of the fmal design report. In addition, the Engineer will <br />provide an electronic version of the report and associated documents on a compact disc (CD) in <br />pdfformat that is compatible with Orchard City's computer system. <br /> <br />Task A600: Dam Safety Application <br /> <br />Engineer will assist Orchard City in obtaining approval to construct the Dam from the Colorado <br />State Engineer's Office (SEa).. As required, the Engineer will contact the SEa, prepare the <br />documents for Orchard City review and obtain Orchard City's approval for the SEa application <br />to construct a dam. The engineer will address any questions regarding the application with the <br />SEa and make the necessary revisions. The required documents for the SEa approval to <br />construct a new dam include the following: <br /> <br />. <br /> <br />Application Form <br />Design Drawings <br />Specifications <br />Design report consisting of <br />Hydrology report <br />Geotechnical report <br />Instrumentation Plan <br />Engineer's cost estimate <br />Filing fee <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Following approval for construction, put prior to fmal inspection of the Dam, the following <br />documents need to be prepared and, submitted to the SEO for approval before initial filling of <br />the reservoir may begin: - <br /> <br />. <br /> <br />Construction Report <br />Initial Filling Plan <br />Long-term monitoring plan <br />Emergency Preparedness Plan <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Supporting information for the information listed above consists of but is not limited to dam <br />failure inundation maps and an Instrumentation Monitoring and Reporting Plan. These items are <br />not included in the Final Design Scope of Work. <br /> <br />It should be noted that members of our team have favorable relationships with the SEOand have <br />worked with most of the current SEO staff on a number of recent dam designs and <br /> <br />5:\PROPOSALS\2006 PROPOSALS\P06-078 - ORCHA~.D CITY RESERVOI R\P00-078 -ORCHARO CiTY RESERVOIR. DOC <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.