My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gunnison - Orchard City Water Reservoir Project (Remaining Tasks)_Application
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Gunnison - Orchard City Water Reservoir Project (Remaining Tasks)_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 5:04:49 PM
Creation date
4/17/2007 1:53:04 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Gunnison
Applicant
Town of Orchard City
Description
Water Reservoir Project (Remaining Tasks)
Account Source
Statewide
Board Meeting Date
9/19/2007
Contract/PO #
150410
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />9J\C. <br /> <br />SMITH WILLIAMS CONSU~ TANTS, INC" <br /> <br />Orchard City Reservoir Proposal for Engineering Services <br /> <br />December 18, 2006 <br />Proposal POG-078 <br /> <br />Outlet Works Mechanical Standard Details <br />Outlet Works Gate Sections and Details <br />Outlet Works Trash Rack Plan, Sections & Details <br /> <br />- Piping Drawings <br /> <br />Raw Water Pipeline Plan and Profiles <br />Raw Pipeline Sections and Details <br /> <br />Specifications <br /> <br />. <br /> <br />Site Preparation. <br />Clearing and Grubbing. <br />Soil Stripping. <br />Diversion and Care of Water <br />Foundation Preparation. <br />Foundation Dewatering. <br />Cutoff. <br />Exploration. <br />Dental Concrete. <br />Earthwork. <br />Excavation. <br />Earth Fill Materials <br />Earth Fill Placement arid Compaction <br />Material Handling. <br />Testing Procedures. <br />Concrete, Reinforcement <br />Concrete Mixing and Placement. <br />Steel Reinforcement.. <br />Admixtures. <br />Curing and Curing CompolUlds. <br />Outlet. <br />Water Control Gates and Valves. <br />Air Vent" <br />Operating Equipment. <br />Bedding Requirements.. <br />Miscellaneous Structural Work. <br />Metal Fabrication and Installation. <br />Mechanical Work. <br />Raw Water Piping. <br />Outlet gate. <br />All technical specifications will also include quality control testing requirements and <br />frequencies to assure compliance with the specifications. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />S:\PROPOSALS\2006 PROPOSALS\PQ6.078 - ORCHARD CITY RESERVQlR\P06-078 ..oRCHARD CITY RESE~VOIR.DOC <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.