My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gunnison - Orchard City Water Reservoir Project (Remaining Tasks)_Application
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Gunnison - Orchard City Water Reservoir Project (Remaining Tasks)_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 5:04:49 PM
Creation date
4/17/2007 1:53:04 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Gunnison
Applicant
Town of Orchard City
Description
Water Reservoir Project (Remaining Tasks)
Account Source
Statewide
Board Meeting Date
9/19/2007
Contract/PO #
150410
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />9M: <br /> <br />SMITH WILLIAMS CONSULTANTS, INell <br /> <br />December 18, 2006 <br />Proposal P06-078 <br /> <br />Orchard City Reservoir Proposal for Engineering Services <br /> <br />It anticipated that approximately 25 design drawings will be generated as part of the fmal design <br />efforts. The draft final design drawings and specifications will provide the following <br />information: <br /> <br />General Drawings <br /> <br />Cover Sheet <br /> <br />Drawing Index <br />Project location <br />Abbreviations and symbols <br /> <br />Foundation Drawings <br /> <br />Site Exploration <br />Foundation Plan and Profile <br />Dam Foundation Treatment Details <br />Local Excavation for Cutoff Trench <br /> <br />Embankment Drawings <br /> <br />Dam Plan and Profile <br />Dam Sections and Details <br />Transverse Contraction Joint Details <br />_Cutoff Trench Plan and Profile <br />Spillway Plan, Profile Sections and Details <br />Stilling Basin Sections and Details <br /> <br />Outlet Drawings <br /> <br />Dam Outlet Plan and Longitudinal Section <br />Dam Outlet Standard Concrete and Reinforcement <br />Dam Outlet Pipe Encasement Concrete Plan and Sections <br /> <br />Instrumentation Drawings <br /> <br />Instrumentation Plan Profile Sections <br />Piezometer, Inclinometer and Extensometer Installation Details <br />Surface Monument Details <br /> <br />Mechanical Drawings <br /> <br />Mechanical Standard Symbols and Abbreviations <br /> <br />S:\PROPOSALS\2006 PROPOSALS\P06-078 . ORCHARD CITY RESERVOIR\P06-078 -ORCHARD CITY RESERVOIR. DOC <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.