My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gunnison - Orchard City Water Reservoir Project (Remaining Tasks)_Application
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Gunnison - Orchard City Water Reservoir Project (Remaining Tasks)_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 5:04:49 PM
Creation date
4/17/2007 1:53:04 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Gunnison
Applicant
Town of Orchard City
Description
Water Reservoir Project (Remaining Tasks)
Account Source
Statewide
Board Meeting Date
9/19/2007
Contract/PO #
150410
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />9NC <br /> <br />SMITH WILLIAMS CONSULTANTS, INC. <br /> <br />December 18,2006 <br />Proposal P06-078 <br /> <br />Orchard City Res~rvoir Proposal for Engineering Services <br /> <br />· 60 gradations (ASTM D422) <br />· 6 Proctors (ASTM D-1557) <br />· 10 - 15 CD triaxial shear tests <br />· Direct shear tests (15 pts) <br />· 8 permeability tests (ASTM D5084-00, 3 pts test) <br />· 30 specific gravity tests (ASTM C-128) <br />· 30 hydrometers <br /> <br />Task A500: Final Design: <br /> <br />The Dam will be designed based on the results of the alternative analysis. The configuration will <br />be optimized, to the extent practical, to achieve the most cost effective safe design. Based on <br />discussions with Orchard City and the requirements of the State Engineer's Office (SEO) for <br />constructing dams the design will include, as.a minimum, the following: <br /> <br />· Determination of the probable maximum flood. <br />· Hydraulic calculations to determine the size of the emergency spillway.. Calculations for <br />the design of the overflow spillway and the loading conditions utilized. <br />· Design calculations to size the outlet structure. In addition, structural calculations used to <br />detennine the size of the concrete base mat and walls of the outlet structure. Calculations <br />will size all reinforcing steel in the base mat and walls. <br />· Hydraulic calculations for detennining the required depth and length of the spillway <br />stilling basin. Structural calculations for determining the thickness and amount of <br />reinforcement required for the stilling basin walls and base mat. <br />· Summary of the geotechnical investigation including logs of test borings and geologic <br />cross-sections. <br />· A ~mmary of material testing results and the location and logs of test pits. <br />· A summary of geological investigations consisting of: . <br />Regional perspective of the site~s geologic and seismic setting at a scale <br />appropriate to the geologic complexity of the area.. <br />Seismic evaluation establishing the relationship of the site to all seismic features <br />of concern. . <br />Site geology of areas affected 'by construction activities and appropriate adjacent <br />areas. <br />Plans to compensate for any geological weakness in the dam foundation. <br />· Foundation treatment and abutment contact design. <br />· -Stability analysis of the structure using the computer program SLOPE/W or equivalent. <br />The stability analysis will consider different loading conditions such as post construction, <br />long term nonnal pool, rapid drawdown, maximum pool and seismic conditions. <br />· Seepage considerations consisting of a cutoff trench design, blanket drain and/or seepage <br />collection piping. . <br />· Design of the instrumentation for the dam. <br /> <br />S:\PROPOSALS\2006 PROPOSALS\PQ6.078 - ORCHARD CITY RESERVOIR\P06-078 -ORCHARD Clrf RESERVOIR.DOC <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.