Laserfiche WebLink
<br />., <br />+.. <br /> <br />/VLd ~4rvfL--~~SCr ~ ~otft.e:-?L <br /> <br />~ <br />. <br /> <br />~ <br /> <br />RED, Inc., Engineering Consultants <br /> <br />GROONDWATKR APPROPR:tATORS OlP THE SOUTH PLATTE (GASP) <br />COSTS FOR RECONNAISSANCE STUDY OF <br />LOWER SOUTH PLATTE RIVER SUSTAINMENT PROJECT <br /> <br />PERSONNEL COSTS <br /> <br />PM <br /> <br />PE <br /> <br />DE <br /> <br />SE <br /> <br />DT <br /> <br />1. AREA ASSESSMENT <br />a. Storable Flows/Firm Yields <br /> <br />b. Storage Site Evaluations <br /> <br />2 <br /> <br />4. <br /> <br />1 <br /> <br />2 <br /> <br />4. <br /> <br />4. <br /> <br />1 <br /> <br />2 <br /> <br />c. Power Rates -- Present & Future <br /> <br />2 <br /> <br />4. <br /> <br />2. WATER USE EVALUATIONS <br />(Preliminary Operations Studies) <br />a. Site Recharge Characteristics 1 <br /> <br />2 <br /> <br />4. <br /> <br />8 <br /> <br />b. Irrigation Deliveries & Timing <br /> <br />4 <br /> <br />2 <br /> <br />4 <br /> <br />c. River Augmentation Requirements 1 <br /> <br />4 <br /> <br />4 <br /> <br />d. Wildlife/Recreation/ET Uses <br /> <br />2 <br /> <br />4 <br /> <br />1 <br /> <br />3. <br /> <br />PLAN FORMULATION <br /> <br />4 <br /> <br />8 <br /> <br />4 <br /> <br />4. <br /> <br />4. <br /> <br />PROJECT BENEFITS ANALYSES <br /> <br />8 <br /> <br />8 <br /> <br />4. <br /> <br />4 <br /> <br />s. <br /> <br />ALTERNATIVE SELECTION & REPORT 4 <br /> <br />4 <br /> <br />4 <br /> <br />8 <br /> <br />Estimated Civil/Water Resource Engineering <br /> <br />$7,072 <br /> <br />OTHER DIRECT COSTS <br /> <br />1. Mileage <br /> <br />1200 @ $0.27 <br /> <br />2. Telephone & Facsimile Transmission <br /> <br />3. Reproduction <br /> <br />Total estimated direct costs <br /> <br />Estimated Reconnaissance Study Cost <br /> <br />$7,746 <br /> <br />--------------------------------------------------------------------------------- <br /> <br />RBD, Inc. <br /> <br />Schedule of Hourly Rates <br /> <br />Title <br /> <br />Code <br /> <br />Senior Project Engineer <br />Project Engineer <br />Design Engineer/Specifier <br />Staff Engineer <br />CADD Design Technician & Work Sation <br />Two-man survey crew <br /> <br />PM <br />PE <br />DE <br />SE <br />DT <br />SV <br /> <br />m!: <br /> <br />~ <br /> <br />72.00 <br />60.00 <br />52.00 <br />47.00 <br />50.00 <br />72.00 <br /> <br />COST <br /> <br />400 <br /> <br />684 <br /> <br />328 <br /> <br />600 <br /> <br />516 <br /> <br />520 <br /> <br />352 <br /> <br />1,164 <br /> <br />1,372 <br /> <br />1,l.36 <br /> <br />$ 324 <br />250 <br /> <br />100 <br /> <br />674 <br />