Laserfiche WebLink
<br />J. <br /> <br />FEE 07: '95 02:49PM RED INC FORT COLLINS <br /> <br />.. <br /> <br />x~. <br />r/~ i <br />t ; <br /> <br />I <br /> <br />ReO, Inc., Engineering consul~anes <br /> <br />caKOtJm)WA'l'JlR A>>paOJila~A'rORS OF TKS SOUTH PLA'r'l'S (GASP) <br />cos~s iOR i~ASIBILITY STUDY OF <br />LOWER SOUTH PLATTD RIVE~ SUSTAINMENT ~ROJECT <br /> <br />PERSONNEL COSTS <br /> <br />D <br /> <br />PB <br /> <br />es <br /> <br />a <br /> <br />10 <br />a <br /> <br />SB <br /> <br />eT <br /> <br />!Y <br /> <br />a <br /> <br />:;14 <br /> <br />P.3 <br /> <br />COST <br /> <br />$ 4,4S0 <br /> <br />1,220' <br /> <br />328 <br />45,000-50,000 <br /> <br />bJ;.g <br /> <br />72.00 <br />60.00 <br />52.00 <br />47.00 <br />50.00 <br />12.00 <br /> <br />3,032 <br />4.a76 <br /> <br />2,952 <br />1,364 <br /> <br />3.280 <br /> <br />2,060 <br /> <br />$ 324 <br />250 <br /> <br />100 <br /> <br />$69,300 - $74,300 <br /> <br />674 <br /> <br />asI.'l, Inc:. <br /> <br />SQhed~le of Ko~~ly Rates <br /> <br />4 <br /> <br />2. <br /> <br />4 <br /> <br />1. : Preliminary iacility <br />: Configuraeion s. Sizing <br /> <br />2. Preliminary Hydrology <br /> <br />3. Dam Classification Analysis <br /> <br />4. asotschnical Analysis <br /> <br />5.: Preliminary Spillway Oesign <br /> <br />4> <br /> <br />16 <br /> <br />12 <br /> <br />4. <br /> <br />(Lump - Empire Labs). <br /> <br />6 <br /> <br />g <br />12 <br />8 <br /> <br />lJ <br />16 <br /> <br />16 <br /> <br />4 <br /> <br />8 <br /> <br />8 <br />20 <br /> <br />a <br />16 <br /> <br />12- <br />16 <br /> <br />8 <br /> <br />8 <br /> <br />~__________________________~____~_._.~_ft...__.."_.__.ft~"~~---------------------- <br /> <br />I <br />6.: Preliminary Outlet Oesign <br />7.; Ar8& Analyses & Designs <br /> <br />4. <br /> <br />lEi <br /> <br />8 <br /> <br />8 <br /> <br />8 <br /> <br />l2 <br /> <br />16 <br /> <br />~ <br /> <br />$'23,59:2 <br /> <br />45,000-50.000 <br /> <br />8 <br /> <br />8 <br /> <br />, <br />~-~-----------------------------------------------------------------------..... <br /> <br />I <br />S.: F~A3ibility CQ3t Eseimate <br />9.: prQjece Senef1ts Analysis <br /> <br />2 <br /> <br />8 <br /> <br />12 <br /> <br />prepare Feasibility Repor~ <br /> <br />8 <br /> <br />E8eimae.d ~ivil/Wat.r a.source !ngineering <br /> <br />Range tor aeotschnical Engine.ring <br />Range on Total Technic.l Personnel Costs <br /> <br />O~KER DIRECT COSTS <br /> <br />L <br />I <br />I <br />2:. <br /> <br />1200 <Ill $0,27 <br /> <br />Mileage <br /> <br />Telephone & Facsimile Transmission <br /> <br />3: . Reproduction <br /> <br />Total estimated oirect costa <br /> <br />Estimated Range of Feasibility Study Costs * <br /> <br />t Exclu~es permi~~ing SUPPQr~ <br /> <br />Title <br /> <br />Senior Project Engineer <br />Projece Engineer <br />Design Engineer/specifier <br />Staff Engineer <br />CAnO Dssign Technician & Work Sat ion <br />Two-man survey crew <br /> <br />....a.a.. <br /> <br />Qa,592-73,592 <br /> <br />Cod.e <br /> <br />PM <br />PE <br />DE <br />SE: <br />OT <br />SV <br />