Laserfiche WebLink
<br />Colorado Water Conservation Board <br />Department of Natural Resources <br /> <br />721 State Centennial Building <br />1313 Shennan Street <br />Denver. Colorado 80203 <br />Phone (303) 866-3441 <br />FAX (303) 866-4474 <br /> <br />t-~. <br />-.. <br /> <br />~.~"; <br />1>- <br /> <br />January 8, 1996 <br /> <br />STATE OF COLORADO <br /> <br />. <br /> <br />Roy Romer <br />Governor <br /> <br />James S. Lochhead <br />Executive Director, DNR <br /> <br />Daries C. We, P .E. <br />Director. CWCB <br /> <br />Mr. Glenn E. Porzak <br />Porzak, Browning and Johnson <br />1300 Walnut St.. Suite 100 <br />Boulder, CO 80302 <br /> <br />Re: Eagle Park Reservoir Loan Application <br /> <br />Dear Mr. Porza.k: <br /> <br />We have reviewed, in detail, the Construction Fund loan application dated August 31, 1995 <br />from Eagle County, the Upper Eagle Regional Water Authority, Vail Associates, and Vail <br />Valley Consolidated Water District for the Eagle Park Reservoir project and would like to <br />request some additional information in order to meet the requirements of the Guidelines for. <br />Financial Assistance through the Colorado Water Conservation Board Construction Fund and <br />to complete our memorandum and presentation for the January 24th Board meeting. It is our <br />intent to make a formal recommendation to the Board at that meeting regarding the <br />applicants' request for an initial $3,125,000 in funding. <br /> <br />The requested information is as follows: <br /> <br />1. Technical Information <br /> <br />a. <br /> <br />? <br />,I <br /> <br />yb. <br /> <br />IIN~~C'J <br />~ ~ IJ", t/ <br />~ <br />d. <br /> <br />Additional information regarding the dam, reservoir, and appurtenant structures <br />such as; the final dam embankment characteristics; reservoir depth, area, and <br />capacity relationships; State Engineer's class and hazard rating for the dam; and <br />spillway and outlet works sizing and configuration, <br /> <br />A description of the tailings removal program and any lining or pther <br />measures proposed for rehabilitation of the reservoir site, <br /> <br />A description of the process to be used by the agency or agencies responsible <br />for certification of the cleanup of the reservoir site, and <br /> <br />An implementation schedule for the completion of the rehabilitation of the <br />reservoir site and any other construction necessary to begin deliveries of water <br />from the project. <br />