My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01868
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01868
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 1:34:21 PM
Creation date
4/9/2007 2:52:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153829
Contractor Name
Eagle Park Reservoir Company
Contract Type
Loan
Water District
37
County
Eagle
Bill Number
SB 96-153
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~_~..oJ <br /> <br />,-, f'" <br /> <br />Mr. Glenn E. Porzak <br />January 8, 1996 <br />Page Two <br /> <br />2. Institutional Information <br /> <br />a. More information regarding item 3., " Type of organization", in the loan <br />application (your letter to me of October 25, 1995 could serve as the basis for <br />a response to this item), <br /> <br />b. A preliminary indication of the extent of participation by each of the applicants <br />in the project; i.e., the projected ownership of stock in the proposed ditch and <br />reservoir company by each of the four entities and the expected project yield <br />for each, <br /> <br />c. The status of any current water rights filings or proceedings, <br /> <br />d. A swnmary of any permits required and the status of permit applications, and <br /> <br />e. The terms and status of contractual arrangements between the applicants and <br />Cyprus Climax Metals Company for acquisition of the Eagle Park Reservoir <br />site to include a description of any guarantees to be provided by Cyprus Climax <br />with regard to the suitability of discharges from the reservoir for the applicants' <br />intended project purposes. <br /> <br />3. Financial Information <br /> <br />a. Copies of the three most recent annual financial statements for each of the four <br />applicants, <br /> <br />b. A schedule of funding requirements along with a description of any other <br />sources of funding (in addition to the CWCB) for the project, <br /> <br />c. A projection of all revenues and expenditures (both capital and operating) by <br />the proposed ditch and reservoir company for the period of CWCB debt <br />retirement to include a reserve fund equivalent to one annual payment on the <br />Construction Fund loan(s) (see Appendix B of the Construction Fund <br />Guidelines for an example), and <br /> <br />d. Some indication of the financial impact of the project on the four applicants in <br />terms of increase in total indebtedness and (where applicable) rates or charges <br />to water users along with sufficient information to allow the reader to <br />understand how the financial impact was estimated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.