My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01868
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01868
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 1:34:21 PM
Creation date
4/9/2007 2:52:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153829
Contractor Name
Eagle Park Reservoir Company
Contract Type
Loan
Water District
37
County
Eagle
Bill Number
SB 96-153
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br /> <br />TEL:1-303-?61-2802 <br /> <br />W.W. Wheeler & Assoc <br /> <br />,. <br /> <br />I <br />l <br />~, .. <br /> <br />Jan 22 96 <br /> <br />16:09 No.004 P.O? <br /> <br />,,- .,-' <br /> <br />Review of -..Plans: <br /> <br />Sheet 3 of 5: The details showing the reducer fitting for a 16 <br />inch diameter to 24-inches, cut on a bias is not drawn correctly, <br />unless a very non standard fitting ia to be built. We would <br />suggest a reducing API elbow may be available that will allow a <br />welded tap for the air vent may be your best ohoice, We bring up <br />the issue because the contractor may offer this in lieu of the <br />special cast fitting, <br /> <br />Sheet 3 of "5: How will the gage system work? The pipe appears to <br />be buried in the riprap, <br /> <br />Review of SoecificatioQs: <br /> <br />1. Certification Page - <br />el) The application form has replaced the need for the owner <br />to acoept the project, <br /> <br />(2) The statement concerning changes need to i"iiclude the <br />plans or drawings as well. <br /> <br />2. Spec A Pg. 14: When will the Dam Crest Surfacing be placed; <br />"before or after the final crest elevation 10,725.01 <br /> <br />3, Spec G: Quality Assuranoe, It is very good to place a <br />discussion of the Quality Assurance program here as well as <br />throughout the speoifications. Is noticed that specifications <br />inolude discussions of test frequenoies and remedi~s for failure at <br />eaoh section. We do agree that it is important to i.nform the <br />contraotor on just what to expect during construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.