Laserfiche WebLink
<br />'W . W. Wh eel e r 8. As s 0 C <br /> <br />TEL:1-303-761-2802 <br /> <br />Jan 22 96 <br /> <br />16:07 No.004 P.03 <br /> <br />I <br /> <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I , <br /> <br />^." <br /> <br />~ <br />~ <br />t <br />~ <br />~ <br />~ <br />~ <br />~ <br />1 <br />.~ <br />~ <br /> <br />? <br /> <br />Construction of 8 cutoff wall and pump-back. facility Is also underway lit a site <br />located below Robinson Reservoir dllm, The qUlllity of the water in the seep system at the <br />dam Is presently unsuitable for use In Eagle Park Reservoir, located downstream of <br />Robinson Reservoir, The purpose of the cutoff wall and pump-back facility is to collect <br />seepage from the underdraln system at the dam, and to pump this water back Into <br />Robinson Reservoir. Project completion Is scheduled for May 1996, <br /> <br />The outlet works construction at Eagle Park Reservoir has been Interrupted by <br />winter conditions, Work completed to d.te Includes excavetion of the site, installation Of <br />the outlet works pIpe, concrete encasement, 8nd Inlet structure. The remaining work to <br />be completed during spring 1996 Includes backfill placement and installation of the gate <br />and operator equipment. As 8 pa" of this construction project, Climax witlalso plug and <br />abandon the Lower Nonh Interceptor Pipeline that presently extends through the <br />embanlc.ment. The outlet works construction Is scheduled for completion during June <br />1996, <br /> <br />Upon completion of the tailing removal, scheduled for spring 1996, Climax will <br />allow the reservoIr to partially fill. Weter qu.llty analysis will be conducted to assess the <br />effectiveness of the cleanup effort, Climax Is prepared to flush the reservoir to obtain <br />water Quality consistent with in-stream standards for the East Fork Eagle River. Additional <br />cleanup work may be conducted prior to making B second filling of the reservoir, The <br />schedule for completion of the cleanup effort Is dependent on the results of the wlter <br />Quality analysis, Although It Is anticipated that the cleanup program will be completed by <br />May 1996, Climax can make no assuraoces concerning the completion date. Delivery of <br />- <br />water to the East Fork of the Eagle River Is under the jurisdiction of the Water Ouality <br />- <br />Control Commission and the Colorado Department of Minerals. Water will be released from <br />the reservoir Into the East Fork Eagle River when Climax demonstrates that the water <br />meets appropriate str8am standards. <br /> <br />[Climax is presently accepting proposals from outside consultants for engineering <br />services. The scope of work for the selected consultant will include the development of <br />B program for evaluation of the cleanup effectiveness and wlter quality, <br />. ;./4//5 /I;/S? /f..-vs ~ C&r1sc/k /~ O//~ <br />~r'1'-? d/4-~Ii"S ~ 7~~? <br />