Laserfiche WebLink
<br />W.W. Wheeler & ~ssoc <br /> <br />TEL:1-303-761-2802 <br /> <br />Jan 22 96 <br /> <br />16:06 No.004 P.02 <br /> <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />f <br />I <br />I <br />I <br /> <br />'"' <br />.... <br /> <br />.' <br />. <br /> <br />January 22, 1 996 <br /> <br />J W. W. Wheeler and Associates, Inc. <br />~ Water Resources Engineers <br /> <br />Mr. Glenn E, Porzak <br />1300 Walnut Street, Suite 100 <br />Porzek Browning & Johnson llP <br />Boulder r Colorado 80302 <br /> <br />R.: '1061,3. Eagle Park Res.lVoIr <br /> <br />Dear Glenn: <br />The purpose Of this letter Is to provide the technical information that you requested <br />concerning Eagle Park Reservoir and the tailing removal operations, Enclosed are two <br />caples each of the following d,ocuments: <br />. .Oeslgn Report for Eagle Park Reservoir Outlet Works Facilities. r prepared <br />by Wheeler, July 1995. <br /> <br />. · Flood Hydrology for Eagle Parte Re8ervoir., prepared by Wheeler, November <br />1994, <br /> <br />" Construction drewingt for the Eagle Park Reservoir outlet works project. <br /> <br />~I Memo of Design Review, prepared by the staff of the State Engineer. This <br />memo contains a general summary of Information concerning the dam and <br />reservoir. <br /> <br />" letter from the Division of Minerals end Geology dated September 20, <br />1995 concemin9 acceptance of the plens and specificutions for installation <br />of outlet works at Eagle Park Reservoir. <br /> <br />TaHlnas Removal Progl1lm. The program involves the excavation Bnd removal of <br />roughly one million cubic yards of tailing. The tailing Is being hauled and deposited on the <br />Tenmlle Tailing Pond. an industrial facllltv located about 1.5 miles east of Eagle Perk <br />Reservoir, Work progressed during summer and fall of 1995 and the project is presently <br />estimated to be over 60 percent complete, Tailing removal is scheduled to resume in late <br />January 1996, for potential completion In Mav. Delays in project completion mav <br />potentially be encountered, Climax currently plans to continue with its cleanup work, as <br />necessary, until the project Is completed. If cleanup Is not completed prior to the 1996 <br />spring runoff, pumps will be used to dewater the site, The required pumping equipment <br />Is presently In place, and the water will be pumped to Robinson Reservoir, 8 nearby <br />industrial facility used for the storage of process wate:; <br />~t1tlff ~ fC/~7~ pYl~t/& ? <br /> <br />3700 South Iflca Street <br /> <br />Englewood. Colorodo 80110 <br /> <br />(303) 761-4130 <br /> <br />FAX (303) 761-2802 <br />