My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01868
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01868
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2014 1:34:21 PM
Creation date
4/9/2007 2:52:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153829
Contractor Name
Eagle Park Reservoir Company
Contract Type
Loan
Water District
37
County
Eagle
Bill Number
SB 96-153
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />W.W. Wheeler & Assoc <br /> <br />TEL:1-303-761-2802 <br /> <br />Jan 22 96 <br /> <br />16:08 No.004 P.04 <br /> <br />P.nnltl, The Colorado Department of Minerals and Geology has approved a <br />technical revision to its reclamation permit for tailing removal, Climax has also obtained <br />acceptance of the plans for construction of the outlet works from the Colorado Depanment <br />of Minerals and Geology and from the Office of the State Engineer, No other permits are <br />required for construction of this facllltv. <br /> <br />/ 1- #J lJ'..! DelJ'lrtment of Miner.'. .nd G.ology e'" he. jurisdiction over Env~onm.nt.1 <br />~ ~ D ~ Protoctlon Facllitie~ related to Its stltus as . Designated Mining Operation. The Facilities <br />vI"& t- include the cutoff and pump-back facilities at Robinson Reservoir, <br /> <br />w~~}0 <br />~) <br /> <br />Plans are being considered for construction of the East Fork Interceptor Pipeline, <br />The purpose of this proposed facility Is to enhance the water supply yield of Eagle Park <br />Reservoir for the benefit of Eagle County water users. Climax plans to apply for a permit <br />from Eagle County for -Efficient Utilization of Municipal and Industrial Water Projects. <br />(a,k.a. .Section 1041 Permit-I. Climax Is presently drafting the Eagle County permit <br />,ppllcatlon. Depending on the final design of the Interceptor pipeline intakes and the <br />-- <br />edopted pipeline route, Climax may also applv to the U,S, Army Corps of Engineers for a <br />S8C1tlon 404 Dredge and Fill Permit, <br /> <br />We hope this information is adequate for your present needs. Please call If you <br />neod any additional information or if you have any questions. <br />Very truly yours, <br /> <br />W, W, WHEELER AND ASSOCIATES, INC, <br /> <br />.)hNt~8~/~/" <br /> <br />Gary B. fhompson, p,t - <br /> <br />GBT:gt <br />encl. <br />cc: John Clapper (w/o encl) <br />Brian Nazarenus (WID encl) <br />M:\OOCUMENn 106' .3\teJIIN22.1'OR <br />
The URL can be used to link to this page
Your browser does not support the video tag.