My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000461
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000461
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:23 AM
Creation date
3/26/2007 10:46:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150123
Contractor Name
Stromberger Land & Cattle Company, LLC
Contract Type
Loan
Water District
64
County
Logan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Water Rights <br /> <br />SLCC currently has decrees on the 12 wells used for irrigating <br />the SLCC farm. These wells are augmented through GASP. The <br />proposed 6 recharge wells and one augmentation well will require <br />a new water right and is currently being sought. This new water <br />right will be for a maximum of 35 cfs with an average annual <br />yield of 6500 acre feet. <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $460,000. <br /> <br />Item Estimated Cost <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />Total Cost <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />1. Drill Well (7 wells) <br />2. Well and Installation (7 wells) <br />3. 18" PVC Pipe (5280 linear feet) <br />4. 21" PVC Pipe (14405 linear feet) <br />5. Pipe Installation (19685 linear feet) <br />6. Electricity for wells (lump sum) <br />7. Dirt Work (lump sum) <br />8. Contingency <br />9. Planning and Design Costs <br /> <br />Total Cost <br /> <br />Feasibility Study <br />Stromberger Land & Cattle Co. <br />Recharge Project <br />October 2002 <br /> <br />8 <br /> <br />$ 5,000 <br />$455,000 <br /> <br />$460,000 <br /> <br />Estimated Cost <br /> <br />$ 63,000 <br />$105,000 <br />$ 38,500 <br />$151,500 <br />$ 29,500 <br />$ 14,500 <br />$ 3,000 <br />$ 50,000 <br />$ 5,000 <br /> <br />$460,000 <br /> <br />/ <br /> <br />/' <br />
The URL can be used to link to this page
Your browser does not support the video tag.