Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Water Rights <br /> <br />SLCC currently has decrees on the 12 wells used for irrigating <br />the SLCC farm. These wells are augmented through GASP. The <br />proposed 6 recharge wells and one augmentation well will require <br />a new water right and is currently being sought. This new water <br />right will be for a maximum of 35 cfs with an average annual <br />yield of 6500 acre feet. <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $460,000. <br /> <br />Item Estimated Cost <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />Total Cost <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />1. Drill Well (7 wells) <br />2. Well and Installation (7 wells) <br />3. 18" PVC Pipe (5280 linear feet) <br />4. 21" PVC Pipe (14405 linear feet) <br />5. Pipe Installation (19685 linear feet) <br />6. Electricity for wells (lump sum) <br />7. Dirt Work (lump sum) <br />8. Contingency <br />9. Planning and Design Costs <br /> <br />Total Cost <br /> <br />Feasibility Study <br />Stromberger Land & Cattle Co. <br />Recharge Project <br />October 2002 <br /> <br />8 <br /> <br />$ 5,000 <br />$455,000 <br /> <br />$460,000 <br /> <br />Estimated Cost <br /> <br />$ 63,000 <br />$105,000 <br />$ 38,500 <br />$151,500 <br />$ 29,500 <br />$ 14,500 <br />$ 3,000 <br />$ 50,000 <br />$ 5,000 <br /> <br />$460,000 <br /> <br />/ <br /> <br />/' <br />