Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The augmentation well to be converted is away from the river <br />and would utilize "in reverse" the piping described above. <br />The augmentation well would never be in use when the <br />recharge wells were needed. <br /> <br />The general locations of these features are shown on the map <br />found in Appendix C. <br /> <br />Water Rights <br /> <br />Stieb Brothers currently have decrees on the 5 wells used for <br />irrigating their farm. These wells are augmented through GASP. <br />The proposed 2 recharge wells and the converting of the <br />augmentation well will require a new water right and is currently <br />being sought. This new recharge water right will be for a maximum <br />of 13.4 cfs with an average annual yield of 6000 acre feet. <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $202,000. <br /> <br />Item <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />Total Cost <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />1. Drill Well (2 wells) <br />2. Well and Installation (2 wells) <br />3. Conversion of Irrigation Well <br />4. 18" PVC Pipe (6500 linear feet) <br />5. Pipe Installation (6500 linear feet) <br />6. Electricity for wells (lump sum) <br />7. Dirt Work (lump sum) <br />8. Contingency <br />9. Planning and Design Costs <br /> <br />Total Cost <br /> <br />Feasibility Study <br />Stieb Brothers Inc. <br />Recharge Project <br />February 2003 <br /> <br />8 <br /> <br />Estimated Cost <br /> <br />$ 2,000 <br />$200,000 <br /> <br />$202,000 <br /> <br />Estimated Cost <br /> <br />$ 18,000 <br />$ 30,000 <br />$ 13,500 <br />$ 68,250 <br />$ 9,750 <br />$ 7,500 <br />$ 13,000 <br />$ 40,000 <br />$ 2,000 <br /> <br />$202,000 <br />