My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000429
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000429
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:09:26 AM
Creation date
3/26/2007 10:41:03 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150136
Contractor Name
Stieb Brothers, Inc.
Contract Type
Loan
Water District
0
County
Logan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~lementation Schedule <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br />~Complete Final Design <br />2. Start Construction <br />3. Complete Construction <br />4. Project is Operational <br /> <br />Date <br />03/31/03 <br />04/07/03 <br />04/18/03 <br />04/19/03 <br /> <br />Social, Economic, and Physical Impacts <br /> <br />The project will have no significant social impacts. <br /> <br />Although Stieb Brothers will be impacted with costs associated <br />with their portion of construction and loan repayment, the <br />project will have a long term positive economic impact by <br />assuring a more certain source of augmentation for their farm. <br />Stieb Brothers will also be able to reduce their assessments with <br />GASP and may have excess augmentation water available to lease <br />for financial compensation. <br /> <br />The project will have no significant physical impacts once <br />construction is complete. The new wells will occupy a minimal <br />amount of space down close to the river and the pipe lines from <br />each well will be buried underground. The recharge pond will <br />occupy ground currently used for nothing. This ground will have <br />setting water part of the year but will return to its current <br />appearance once the water percolates back into the ground. <br /> <br />Per.mitting <br /> <br />All easements and rights of way have been arranged for by verbal <br />agreement. Final written agreements are being arranged for. <br /> <br />Stieb Brothers expects to be exempt from 404 permitting. This <br />will be confirmed with the Denver District, Army Corps of <br />Engineers. <br /> <br />Feasibility Study <br />Stieb Brothers Inc. <br />Recharge Project <br />February 2003 <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.