My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPPD000363
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
LPPD000363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:29:54 AM
Creation date
3/26/2007 10:30:28 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153697
Contractor Name
Norwood, Town of and Norwood Water Commission
Contract Type
Loan
Water District
60
County
San Miguel
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"- ~ , <br /> <br />June 20, 1994 <br />Page 2 <br /> <br />~ <br />. <br /> <br />1 <br /> <br />larger reservoir would be desirable; however, 10 million <br />gallons is probably the maximum affordable size with the <br />$320,000 loan. We will re-evaluate these costs during the <br />Feasibility Report to determine if that amount is still valid <br />to the existing site. <br /> <br />) <br /> <br />We would suggest a water depth for the new reservoir of 15 <br />to 18 feet to reduce the surface area and resultant problems <br />with algae growths and aquatic weeds. At 15 feet deep, the <br />square reservoir would have inside dimensions of 370 ft..x 370 <br />ft. At 18 feet deep, inside dimensions would be about 325 x <br />325. It is probable that the reservoir will have to be lined <br />with a layer of clay; however, there does appear to be some <br />clay material on-site. It may be possible to expand the <br />reservoir at a later date, either by enlarging the reservoir or <br />by building a second reservoir adjacent to the proposed new <br />reservoir. <br /> <br />The use of the proposed site iSihtbV'O ~... contingent upon <br />approval from the Colorado state Lan l~t' also <br />contingent upon verifying subsurface tio t~ 0 gh <br />additional test pits. We still have rece' unication <br />from the state Land Board represent~t' . ~llip). Bill <br />Green stated that he would make an contact Bill <br />Killip directly; however, if nothing ppens, we may ~ant to <br />attend the state Land Board meeting in Gunnison in July, and <br />certainly the Norwood meeting in August. The other option is <br />for a representative from the Norwood Water Commission to <br />contact the head of the state Land Board directly to see if we <br />can get some action. <br /> <br />SCOPE OF ENGINEERING SERVICES <br /> <br />The information provided in each chapter of the report <br />~~~ using the CWCB guidelines is outlined below: - . <br /> <br />~~ ~ 1. Prefacing Material (as required by the guidelines). <br /> <br />c1 :~. Chapter 1= General Information. This chapter will <br />~ ~. I include a brief description of the overall project, <br />f.. r/,including information on location, climata., history of <br />, ~~~ previous development, operational procedures and <br />/_,~fW ( / similar information. We will also need to prepare a <br />~ project map which shows the location of the proposed <br />p tV reservoir and the proj ect are to be served. <br /> <br />. JA/ Chapter II = Description of the Governinq <br />~ Orqanization. This will include a history of the <br />Norwood Water commission, the laws under which it is <br />organized, description of the powers and authori~y of <br />} the organization, financial status (including a <br />financial statement for the most recent years), and <br />
The URL can be used to link to this page
Your browser does not support the video tag.