Laserfiche WebLink
<br />Mr. Larry Frame, Superintendent <br />Julesburg Irrigation District <br />November 27, 2000 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCB Desiqn and Construction Administration Procedures. Tim <br />Feehan will contacted you regarding the CWCB requirements concerning project bidding, <br />design, and construction. Tim will make construction inspections, which will be the basis of the <br />monthly pay estimates for disbursement of your loan funds. <br /> <br />d) You must adhere to the CWCB Guidelines for Financial Assistance. A copy of our Guidelines <br />has been provided to you previousiy. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Small Project Loan from the <br />Colorado Water Conservation Board. <br /> <br />Sincerely, <br /> <br />Mike Serlet, PE, Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />AttaChments: <br /> <br />1. Updated Memo: JulesburglD-Petersonl100memo <br /> <br />cc (w/Attachment 1.): <br /> <br />Mr. Eric Wilkinson, Board Member, Colorado Water Conservation Board <br />Glenn Newlon, NRCS Area Engineer, 2343 27th S1., Suite 506, Greeley, CO 80634-8044 <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrano File <br /> <br />c: wp51\Proj-New\JulesburgIO.Peterson 1100ltr <br />