Laserfiche WebLink
<br />pagosa springs Pipeline Company <br />DRAFT FEASIBILITY STUDY <br />CWCB...January 8, 1996 <br /> <br />Construction Engineering..... <br /> <br />$5,000 <br /> <br />Total: <br /> <br />$60,000 <br /> <br />O,M&R Costs are estimated at $0 per year for the first <br />three years after which costs should be minimal and will <br />be covered by yearly assessments. <br /> <br />4. Implementation Schedule <br /> <br />Complete Final Design <br />Bid the Job (maybe only materials) <br />Bid Opening <br />Start Construction (possible Town Crews) <br />Complete Construction <br />Project is Operational <br /> <br />l/30/96 <br />3/1/96 <br />4/1/96 <br />4/]5/96 <br />6/l/96 <br />6/]5/96 <br /> <br />9 <br />