My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01812
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01812
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:30 AM
Creation date
3/9/2007 11:23:26 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0054FX
Contractor Name
Pagosa Springs Pipeline Company
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />pagosa Springs Pipeline Company <br />DRAFT FEASIBILITY STUDY <br />CWCB...January 8, 1996 <br /> <br />~ Q The project will have a loan to the CWCB which will <br />have to be repaid. <br /> <br />This al ternati ve is feasible, and is considered the <br />preferred alternative. <br /> <br />D. Description of the Selected Project: <br /> <br />1. Water Rights: The Project will access 450-600 GPM of <br />geothermal water after it is utilized by the Town's Geothermal <br />Utility. The Town already owns this water but the year round <br />supply of water would entail a transfer to a different well <br />(PS3 or PS5). The members of the pipeline company agree to <br />the transfer, however, if the transfer is not successful the <br />company will provide water for nine months of the year. <br />Please refer to Appendix 2 concerning water rights <br />documentation. <br /> <br />2. Preliminary Design and Layout is shown in Appendix 1. <br /> <br />3. The narrative description of the project is as follows: <br />The project consist of a insulated pipeline, 8 inches on <br />diameter, 1300 feet in length, and having a capacity of at <br />least 600 GPM. The pipeline will start at the existing Town <br />Geothermal Plant. The pipeline will extend east 900 feet <br />through Centennial Park, then south 150 feet across the new <br />footbridge, and then east 250 feet, to the Spa Motel. <br /> <br />5. Cost Estimates: <br /> <br />Planning costs: These costs will be absorbed <br />by the entities cooperating in this Study, and <br />will primarily involve staff time, with no <br />significant out of pocket expense ........ <br /> <br />$0 <br /> <br />Design Costs: The Town is doing the design at <br />no cost to the pipeline Company...... <br /> <br />$0 <br /> <br />Construction Costs: The construction cost <br />estimate was provided by the Town and <br />is. . . . . $55,000 <br /> <br />Construction Contingencies: <br />Stockholders will assist <br />contingencies...... <br /> <br />Town and <br />in providing <br /> <br />$0 <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.