Laserfiche WebLink
<br />The specific water rights that were to be purchased were: <br /> <br />. <br /> <br />Rural & Godding Ditch rights <br />Lupton Meadows Ditch rights <br />Farmers Independent Ditch rights <br />Weldon Valley Ditch rights <br />TOTAL <br /> <br />$ 3,100,000 <br />$ 2,000,000 <br />$ 2,000,000 <br />$ 5,100,000 <br />$12,200,000 <br /> <br />Rural Ditch shares yield, on average, approximately 74 acre-feet per share. The Godding <br />Ditch yield is approximately 27 acre-feet per share. The Farmer's Independent Ditch <br />yields approximately 18 acre-feet per share. Weldon Valley Ditch provides about 51 <br />acre-feet per share of water. <br /> <br />The cost of the water rights were estimated at approximately $3,000/acre-foot of <br />consumptive use Appropri':lte dryuf.' would be obtained from the areas historically <br />irrigated with purchased shares of water. <br /> <br />Current Status of the Proiect <br /> <br />Central obtained approximately $8~8 million in bond funding in March 2004. These funds <br />were used to acquire all or a portion of the water rights and gravel pit storage listed <br />below. The bond is a 2-year note, and will come due in February 2007. Therefore, the <br />majority of reimbursed funds from the Colorado Water Conservation Board (CWCB) will <br />be used to payoff the bond when it comes due in early 2007. <br /> <br />. <br /> <br />Below is a list of all water assets that have been reimbursed at 90% from the CWCB: <br /> <br />. <br /> <br />4-29-04 <br />4-29-04 <br />5-18-04 <br />1-04-05 <br />1-31-05 <br />2-28-05 <br />3-31-05 <br />4-07-05 <br />5-03-05 <br />5-07 -05 <br />6-01-05 <br />6-07 -05 <br />7-08-05 <br />10-07-05 <br />12-08-05 <br />1-10-06 <br />2-06-06 <br />2-06-06 <br />2-9-06 <br /> <br />Farmers Independent Ditch - 10 shares <br />Windsor Reservoir - 3 shares <br />Godfrey Bottom Ditch - 5 shares <br />Shores Gravel Pit - Lining Pond B <br />Shores Gravel Pit - Lining Pond B <br />Shores Gravel Pit - Lining Pond B <br />Sho[f~s Grav~l Pit Lining Pond A <br />Shores Gravel Pit- Inlet Structure <br />Shores Gravel Pit - Lining Pond A <br />Shores Gravel Pit - Inlet Structure <br />Shores Gravel Pit - Lining Pond A <br />Shores Gravel Pit - Inlet Structure <br />Shores Gravel Pit - Inlet Structure <br />Shores Gravel Pit - Lining Pond A <br />Shores Gravel Pit - Pipeline bore <br />Shores Gravel Pit - Pipeline bore <br />Shores Gravel Pit - Pipeline bore <br />Shores Gravel Pit - Slurry Wall Lining <br />Greeley Irrigation Ditch - 19 shares <br /> <br />$261,418.00 <br />319,436.00 <br />351,120.00 <br />520,065.64 <br />568,071.69 <br />427,452.63 <br />315,096.2:, <br />21,115.11 <br />238,967.57 <br />151,706.04 <br />489,398.54 <br />23,847.44 <br />6,919.78 <br />809,197.70 <br />12,694.37 <br />6,194.82 <br />11,051.37 <br />5,036,947.70 <br />905,000.00 <br />