My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00023 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00023 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:42:43 PM
Creation date
2/15/2007 1:46:04 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/19/2006
Description
CF Section - Revisions to Existing Loans - Central Colorado Water Conservancy District - Project Scope Revision
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Total Requests <br /> <br />$10,475,700.63 <br /> <br />. <br /> <br />90% Reimbursement <br /> <br />$ 9,428,130.57 <br /> <br />Central is paying down the 2-year bond by approximately $1.8 million in June 2006, so <br />that our total debt (CWCB loan and the 2-year bond) will be at $16.6 million. <br /> <br />Changes to the Current Proiect <br /> <br />The most significant change that has occurred since the project proposal was submitted to <br />the CWCB in October, 2004, is the skyrocketing price of senior water rights. We had <br />anticipated acquisition of 4,066 acre-feet of senior water rights at a cost of approximately <br />$3,000 per acre-foot of consumptive use water. Since 2004, the price of senior water <br />ri~!>.ts in th~ Greeley area is in the neighborhood of $8,000 per acre-foot, and around <br />Brighton that cost is closer to $10,000 - $12,000 per acre-foot. This three-fold increase in <br />water values has severely diminished our purchasing power for senior water rights. <br /> <br />Due to the drastic increase in the cost of senior water rights, Central has already begun <br />pursuing an aggressive groundwater banking (recharge) program. To date, we constructed <br />approximately 15 facilities to store water during excess river flows. These sites range in <br />cost of roughly $10,000 - $75,000, and we have already expended $500,000 on recharge <br />projects this spring. In addition, we've developed a large-scale recharge project near <br />Orchard, Colorado, with a cost of approximately $1.9 million. These groundwater . <br />projects are the most economical methods available to provide a fairly reliable source of <br />augmentation water for member's wells. <br /> <br />Formal Request <br /> <br />Central respectfully asks that we be able to submit receipts for groundwater recharge <br />projects that will be used to augment member's wells in the Well Augmentation <br />Subdistrict. This would include $500,000 for the various smaller recharge projects <br />completed this spring, as well as the Orchard Groundwater Banking (recharge) project <br />d~~/e!oped ,~ince Dee:et11ber 2005_ The "t:~i\.S pe.rtiOi1 i)ftll~.t fj{'ujc~t .is apprGj~in.latclj~ <br />$900,000, as it is jointly owned with the Groundwater Management Subdistrict, and that <br />portion cannot be reimbursed by the CWCB. We anticipate the development of an <br />additional $2M-$4M of groundwater recharge projects in the next year. Some limited <br />senior water rights may also be purchased if prices can be held low (in the $5,000 per <br />acre-foot range. <br /> <br />We certainly appreciate your consideration of this request. <br /> <br />Sincerely, <br />T~ <br />Tom Cech <br />Executive Director <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.