Laserfiche WebLink
<br />.. _ _._ _ _.__.____~_ ..._______-...-.....-:.-- _ ..._ ....:...:.--.._...._.._._ _...._.~-:.____ - -- -'---__.__.-<--...:.....0.-'--_ _.__ _...,"._ ...._ __ .. n.._ _ __ ."_' <br /> <br />..,~:~~:.-f;~? ~~~:~: <br /> <br />. <br /> <br />intersection of 4th . and Heron. Crossed Heron, set T and valve for further <br />expansion down Heron, 4" line per specs. Ran 220' to 4th.and Heron alley, <br />installed drain and flush valve here. Hooked 3" athletic service up and charged <br />line. This:first 980' took :from May 1Dltil August First 400' required extensive <br />rock removal and bedding. There were 9 1" taps and 1 3" tap. <br /> <br />STEP 6. Ran 420' to intersection of 5th. & alley at Main. 3 1" taps 90 degrees to go down <br />5th. This section took 45 days, extreme rock excavation, gas line close to main. <br />truck traffic serving business. This ended first years construction. <br /> <br />STEP 7. Ran 280' to intersection of Grape and 5th. Line reduced to 6" down Grape and <br />4" down 5th. Set valves at intersections. 1 tap approximately 10 working days. <br />Started end of April. <br /> <br />STEP 8. Ran 420' 6", 1 air vac at approximately 240'. 8 1" taps and services set valve on <br />6" and charged, approximately 20 working days. <br /> <br />STEP 9. Crossed intersection of 6th & Grape. Set T for 4" extension down 6th. <br />Continued down Grape for 420', 4 1" taps. Gas line on this run on our grade had <br />to be moved Set valve on 6" line and charged Approximately 15 working <br />. days. <br /> <br />STEP 10. Crossed intersection of 7th & Grape. Set T for 4" extension down 7th. <br />ContimJed d~wn Grape for 1,566'. Set valve on 6"line and charged. 71" taps <br />approximately 15 working days. . . . <br /> <br />STEP 11. Went 1,800' :from valve, did drain, air vac, pressure relief: 12 I" taps and 1 3" <br />tap at town parle. Approximately 20 working days. <br /> <br />SUMMARY <br /> <br />This project was started with the towns two Public Wodes employees, who also took care <br />of treatment, distribution and streets. Om- estimated time to construct was from March of <br />1994 to August of 1994. <br /> <br />. <br /> <br />Shortly after the start of construction we enco1Jllter'ed more rock than anticipated which <br />slowed. us considerably, some days we only achieved 8'. This also called for more <br />backfill. Also gas and sewer lines took more time, average of a day per crossing. When <br />we encomtered good soil we averaged 200 to 300' a day. The average tap installation <br />was 2 taps per day. The project would have gone better, but we also contended wi1h a <br />water plant at capacity and several water breaks. This is where I feel additional <br />employees would have gotten us closer to an on time schedule. Test holes also would have <br />given us a better idea of soil conditions and that's why I added it to Preliminary <br />Construction. <br />