My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00488 App Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00488 App Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:29:59 AM
Creation date
2/5/2007 10:30:23 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153774
Contractor Name
Pinon Mesa Ranches
Contract Type
Loan
Water District
30
County
La Plata
Bill Number
SB 97-008
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />..'~, ,~,...;~-~---",,"'.' <br /> <br />~ ~.<---..:"'. <br />'. <br /> <br />.'--.'K": .~":~=:=~:_~~-'."_~""'~_~'_~:_~.,~'.,~,'.:~_~'~'=~"Y~:~,~ ,.,":.. <br /> <br />. <br /> <br />Mr. Charles Palmer, President <br />January 16, 1997 <br />Page 3 <br /> <br />3. Information related to the description of the sponsoring entity, the study area, the <br />socioeconomic characteristics of the study area, and required nontechnical <br />documentation, such as resolutions, will be provided by the sponsoring entity or <br />CWCB staff, if previously furnished. These requirements have been discussed with <br />Mr. and Mrs. Palmer. WWE will summarize such information or incorporate it into <br />the feasibility study in appendices as appropriate, but will not be responsible for <br />assembling the information or for its completeness. <br /> <br />4. Based upon the preference of the project sponsor, feasibility-level design and cost <br />studies will be performed by the firm Absolute H20 of Aztec, New Mexico. We <br />understand that the firm is interested in the project and has agreed with the project <br />sponsor to perform the design engineering at no cost. The scope of Absolute H20's <br />responsibility includes adeqUate feasibility-level coverage of the following areas: <br /> <br />. narrative description of project operation and how the entire project will <br />function, <br /> <br />. maps, layouts, profiles, cross-sections of project components, <br /> <br />. hydraulic and structural design criteria, <br /> <br />. project implementation schedule, and <br /> <br />. estimate of capital and 0, M & R costs. <br /> <br />WWE will review .the design and cost information from Absolute H20 for <br />reasonableness and will base the financial analysis upon the estimated costs. <br /> <br />In the event that Absolute Hp is unable to provide sufficiently complete information <br />to meet the draft report due date, or if WWE and CWCB staff conclude that the <br />information furnished by Absolute H20 is inadequate for purposes of the feasibility <br />study, WWE will develop conceptual design and cost estimates with appropriate <br />contingency factors to enable a substantially complete feasibility study to be <br />presented to the CWCB on 1f29/97. Any such design and cost work performed by <br />WWE will be in addition to the total estimated study cost of $5,000, as discussed <br />below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.