Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />4.2 Additional Option <br /> <br />Option to Extend Period of MRBP Evaluation of Model Performance. <br /> <br />The MRBP analysis in Task #5 is limited to one identified month due to the high labor <br />requirement and subsequent cost. This option would extend the MRBP analyses to cover <br />up to five months of winter seeding operations. Gustavo Carrio from the CSU team <br />would need 4.0 months to complete the additional work under this option. As in Task #5, <br />PI Bill Cotton and Paul Mielke would review the work. <br /> <br />4.3 Research Work Plan Timelines. <br /> <br />The following timeline identifies the time-periods during which each of the six tasks in <br />the basic research proposal, and the option task would be worked on. These timelines are <br />based on a WDMP grant being awarded to the CWCB near the beginning of the DWD <br />2003-2004 operational cloud seeding program, or by November 1, 2003. <br /> <br /> Months from beginning of contract <br /> 1 2 3 4 567 8 9 10 11 12 <br />Task #1 ~ <br />Task #2 ~ <br />Task #3 ( ) <br />Task #4 ( ) <br />Task #5 ( ) <br />Task #6 ( )) <br />Option ( <br /> <br />II-23 <br />