Laserfiche WebLink
<br />- <br /> <br />I <br />I <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br /> <br />Gustavo Carrio from the CSU team will then perform MRBP analyses of model output <br />data to evaluate model performance in forecasting for an identified month at selected <br />sites that are expected to be free from seeding operations and those expected to be within <br />the coverage of seeded plumes. This will require 1.5 months of his time. PI Bill Cotton <br />and Paul Mielke will supervise this analysis task. CWCB consultant Curt Hartzell will <br />monitor the work; Reclamation staff will also review it. Because this task is so labor <br />intensive, the analysis effort had to be reduced to one month in order to stay under the <br />upper-level funding limit specified in the solicitation (see Option). <br /> <br />Task #6 - Research study supervision and preparation of reports. <br /> <br />PI Bill Cotton will supervise the CSU team for each work task as indicated above, and <br />see that the CSU work activities are performed on schedule. Brenda Thompson from the <br />CSU team will monitor all project expenditures and provide Dr. Cotton evaluations of the <br />expenditures; Dr. Cotton will be responsible for the CSU team's activities staying within <br />budget. Brenda will also oversee the procurement of research materials, and will assist in <br />computer system administration including troubleshooting system malfunctions. <br /> <br />The reporting task will be a cooperative effort between CSU PI Bill Cotton, CWCB <br />Consultant Curt Hartzell, and Project Manage Joe Busto. They will agree on the format <br />of the three quarterly letter-style progress reports, and prepare them to meet the schedule <br />specified in solicitation sections B.2.1 and C.6.2(a). PI Bill Cotton with the assistance of <br />Brenda Thompson will draft the quarterly reports and email them to Project Manager Joe <br />Busto and CWCB Consultant Curt Hartzell for review. Dr. Cotton will be made aware of <br />any clarifications or changes made to the reports before they are finalized and sent to <br />Reclamation. <br /> <br />The draft final technical report will be prepared in accordance with solicitation sections <br />B.2.2 and C.6.2(c). The format for the final report shall be developed by PI Bill Cotton, <br />Project Manager Joe Busto, and CWCB Consultant Cut Hartzell, with input from <br />Reclamation WDMP staff. The final report draft will be prepared primarily by the CSU <br />team, and reviewed by Joe Busto and Curt Hartzell. Reclamation staffwill also review <br />the draft final report before it is finalized. The final report will be printed and submitted <br />by the CWCB. <br /> <br />The Project Manager Joe Busto, CWCB Consultant Curt Hartzell, and PI Bill Cotton will <br />hold a midterm project review meeting with Reclamation, and make a presentation on the <br />overall project at approximately the time of delivery of the draft final report to <br />Reclamation (see solicitation section B.2.3). Other CSU team members and the DWD <br />program operational cloud seeding contractor, Larry Hjermstad, are welcome to attend <br />and participate in these meetings. The work on Task #6 will be performed as needed <br />throughout the 12-month period on the WDMP grant from Reclamation. Labor budgeted <br />for his task includes 0.75 month for PI Bill Cotton, 1.0 month for CSU team member <br />Brenda Thompson, and 0.5 month for CWCB Consultant Curt Hartzell. <br /> <br />11-22 <br />