Laserfiche WebLink
<br />I- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Mr. Gerald Baugh, President <br />Weldon Valley Ditch Company <br />December 19, 1996 <br /> <br />2 <br /> <br />d. A contract must be completed before funds can be advanced on your loan. You will <br />be working with Jan Illian during the contracting process, which usually takes 3 to <br />6 months to complete. Jan will assist you with sample stockholder resolutions, and <br />other documents necessary as part of the contracting process. <br /> <br />e. You must adhere to the CWCB Design and Construction Administration Procedures. <br />Mike Serlet will work with you on the CWCB requirements concerning design and <br />bidding of the construction project. During the construction process he will make <br />field inspections, which will be the basis of the monthly pay estimates for <br />disbursements of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Construction Fund Loan <br />from the Colorado Water Conservation Board. <br /> <br />Sincerely, <br /> <br />f1/~?~ <br /> <br />William P. Stanton, P.E. <br />Chief, Project Planning and Construction Section <br />Colorado Water Conservation Board <br /> <br />JVS:jvs <br /> <br />AlIachment: <br />Updated Memo 12f.nov <br /> <br />cc(w/Attachment): <br />Mr. David L. Harrison, Board Member ewes <br /> <br />cc (w/o Attachments): <br />ewes Section B Staff <br />Linda Bassi, AGO <br /> <br />C:\WPSIVOHN\12fNov96.ltr <br />