My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153792 Approval Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153792 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:05:45 AM
Creation date
12/19/2006 10:20:58 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153792
Contractor Name
Weldon Valley Ditch Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB 97-008
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Mr. Gerald Baugh, President <br />Weldon Valley Ditch Company <br />December 19, 1996 <br /> <br />2 <br /> <br />d. A contract must be completed before funds can be advanced on your loan. You will <br />be working with Jan Illian during the contracting process, which usually takes 3 to <br />6 months to complete. Jan will assist you with sample stockholder resolutions, and <br />other documents necessary as part of the contracting process. <br /> <br />e. You must adhere to the CWCB Design and Construction Administration Procedures. <br />Mike Serlet will work with you on the CWCB requirements concerning design and <br />bidding of the construction project. During the construction process he will make <br />field inspections, which will be the basis of the monthly pay estimates for <br />disbursements of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Construction Fund Loan <br />from the Colorado Water Conservation Board. <br /> <br />Sincerely, <br /> <br />f1/~?~ <br /> <br />William P. Stanton, P.E. <br />Chief, Project Planning and Construction Section <br />Colorado Water Conservation Board <br /> <br />JVS:jvs <br /> <br />AlIachment: <br />Updated Memo 12f.nov <br /> <br />cc(w/Attachment): <br />Mr. David L. Harrison, Board Member ewes <br /> <br />cc (w/o Attachments): <br />ewes Section B Staff <br />Linda Bassi, AGO <br /> <br />C:\WPSIVOHN\12fNov96.ltr <br />
The URL can be used to link to this page
Your browser does not support the video tag.