My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153792 Approval Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153792 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:05:45 AM
Creation date
12/19/2006 10:20:58 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153792
Contractor Name
Weldon Valley Ditch Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB 97-008
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />- <br /> <br />"f ..JJM <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866.3441 <br />FAX, 0031 866.4474 <br /> <br />STATE OF COLORADO <br /> <br />- <br /> <br />Roy Romer <br />Governor <br /> <br />December 19, 1996 <br /> <br />J.lmes s. lochhe.ld <br />Executive Director, DNR <br /> <br />Dilrie~ C. lile, PE. <br />Director, ewes <br /> <br />Mr. Gerald Baugh, President <br />Weldon Valley Ditch Company <br />PO Box 626 <br />Weldona, CO 80653 <br /> <br />RE: Rehabilitation of [)in~rsion Structure <br />Loan Recommendation <br /> <br />Dear Mr. Baugh, <br /> <br />Concerning your application for a loan from the Construction Fund, I am pleased to inform you <br />the Colorado Water Conservation Board (CWCB) has decided to recommend "our request for <br />$188,000 to the General Assembly for consideration in the annual Construction Fund Bill. It is <br />our understanding these funds will be used to rehabilitate the company" s diversion structure on <br />the South Platte River. <br /> <br />The CWCB approved a loan term of 20 years at an interest rate of 3.5%. I ha\e attached a copy <br />of the updated Board memo concerning the Weldon Valley Ditch Company. Please refer to page <br />2 of that memo and to the section "Action Taken by the CWCB, November ~5.1 996". <br /> <br />When the Board recommends your loan request to be included in the Construction Fund Bill, <br />there remain several conditions: <br /> <br />a. The bill must be approved bv the General Assemblv and si~nc.,! I" the Governor. <br />This is usually accomplished around June 1st. <br /> <br />b. You must adhere to the CWCB Guidelines for Financial Assistance. A copy of our <br />guidelines has been provided to you. <br /> <br />c. The Feasibilitv Studv must be completed. John Van Sciver will draft the feasibility <br />study. He will request your assistance to ensure the study complies with the <br />Guidelines and statutory requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.